Belkin F1DA208Z manual Powering Up the Systems, Installation, section

Models: F1DA208Z

1 43
Download 43 pages 47.38 Kb
Page 21
Image 21
Powering Up the Systems

Installation

Powering Up the Systems

Verify that all servers connected to the PRO3 KVM Switch are powered on. If any connected servers have not been powered on, it is okay to do so at this time (servers can be powered on simultaneously). The PRO3 KVM Switch emulates both a mouse and keyboard on each port and allows your server to boot normally.

The server connected to Port “1” will be displayed on the monitor. Check that the keyboard, monitor, and mouse are working normally. Check all occupied ports to verify that all servers are connected and responding correctly. If you encounter an error, check your cable connections for that server and reboot. If the problem persists, please refer to the “Troubleshooting” section in this User Manual.

1

2

3

4

5

6

7

8

section

19

Page 21
Image 21
Belkin F1DA208Z manual Powering Up the Systems, Installation, section