This chapter contains the following procedures for installing the Model LRA2900A RAS:
•“Unpacking the Model LRA2900A
•“RAS chassis
•“Cable installation” on page
•“Completing the hardware installation” on page
Unpacking the Model LRA2900A RAS
Inspect the shipping carton for external damage. Note any damage before removing the container contents. Report equipment damage to the shipping carrier immediately for claim purposes. Save all packing materials in case you need to return an item to the factory for servicing.
The RAS comes with the following items:
•The LRA2900A Series Remote Access Server (RAS)
•A
•Control port interface cable, 10 foot (3 meters), standard
•Two WAN connection cables, 10 foot (3 meters) each
•Rack mounting kit with rack ears and mounting hardware
•
Remote Access Server Administrator’s Reference Guide
Model LRA2900A RAS Getting Started Guide
Note Power cables are shipped separately from the Model LRA2900A RAS.
RAS chassis installation
Do the following:
1.If you have not done so already, remove the RAS from its shipping container.
Note The RAS should be placed as close as possible to the termination jack provided by the Telco. Avoid installing the RAS in a location where the power cords or network interface cables could be accidentally dis- connected. The location should be well ventilated. Do not block the RAS’s cooling vents.
2.If you are installing the RAS in a
3.Install the rack mounting ears onto the RAS using the mounting hardware provided.
4.Place the RAS at the desired position in the rack.