Model LRA2900A RAS Getting Started Guide | 2 • Hardware installation |
|
|
5.Secure the RAS in position with the mounting screws.
Cable installation
This section describes installing the power, ground, and network interface cables.
Installing the power cables
This section describes installing the female end of the power cables into the
1.Install a power cable into an
Power cable retainer clip
| - | 264V |
| Hz) | |
90 |
| |
(50 | ||
AMP | ||
2 |
|
|
ETHERNET
Grounding stud
(2 places)
Figure 5.
To avoid the risk of injury from electric shock, the power cords connected to the
2.Rotate the power cable retainer clip so it secures the power cable plug in the
ETHERNET
Grounding stud
Power cable retainer clip
| - | 264V |
| Hz) | |
90 |
| |
(50 | ||
AMP | ||
2 |
|
|
Figure 6. Power cable retainer clip
Cable installation | 24 |