5.Install the ground wire onto the grounding stud.

5 • Troubleshooting and maintenance

Model LRA2900A RAS Getting Started Guide

 

 

Installing the replacement RAS

1.If you are installing the replacement RAS in a 19-inch rack, go to step 2. Otherwise, place the RAS at the desired location, then go to step 5.

2.Install the rack mounting ears onto the RAS using the mounting hardware provided.

3.Place the RAS at the desired position in the rack.

4.Secure the RAS in position with the mounting screws.

5.Install the ground wire onto the grounding stud.

6.Connect the following cables onto the RAS:

the T1/E1/PRI WAN cables

the RS-232 CONFIG cable

the 10/100 ETHERNET cable

7.Install the power cable into their IEC-320 connectors.

8.Rotate the power cable retainer clips so they secure the power cable plugs in the IEC-320 connectors.

Verifying the hardware installation

1.Connect the male end of the power cord to a power distribution strip or to a wall outlet.

2.Verify that the green POWER LED is lit.

Importing a saved configuration

Before the RAS can be configured the IP address and the netmask needs to be set up. This setup is done through the RAS RS-232 CONFIG port on the RAS.

1.Install the supplied DB-9-to-RJ-45 cable between the RAS RS-232 port (see figure 7 on page 25) and an open serial port on your computer.

2.Start a new VT-100 terminal session configured with the following characteristics:

Direct connection to COM port

19.2 kbps

8 bits

No Parity

1 Stop bit

No flow control