
6 en Unpacking and Installing the HardwareDSDA iSCSI Disk Array Series
3 | Unpacking and Installing the Hardware | ||
|
| ||
i | NOTICE! | ||
For more detailed information on the hardware installation please refer to the documentation | |||
| |||
| available on www.boschsecurity.com under Product Catalog > CCTV > IP Video > Disk | ||
| Arrays. | ||
|
| ||
|
| ||
! | WARNING! | ||
The storage system is heavy. Two people are required to lift a system. | |||
| |||
|
| ||
|
| ||
! | CAUTION! | ||
Only use the rail kit supplied with the system. Using a different rail kit can cause injury to you | |||
or damage to your system. | |||
|
|
| |
| 1. | Unpack your system by opening the packing box and lifting the outer shipping box off the | |
|
| pallet. | |
| 2. | Install the appropriate rack mount for your installation and system using the Rack | |
|
| Installation flyer in the rail kit box for reference. | |
| 3. | Install the appropriate rack mount for any disk shelves that will be connected to the | |
|
| system | |
| 4. | With two people, lift the system into the rack or system cabinet, and secure it to the rack | |
|
| uprights. The system weighs slightly over 30 kg (67 lb) and requires one person at the | |
|
| end of the system to guide it into the rail ends. | |
| 5. | For installation and wiring of additional disk shelves, see Section 6 Adding Storage, | |
|
| ||
| 6. | Connect the power cords, making sure that the power supplies are connected to | |
|
| separate AC power sources. This ensures redundant power sources. | |
|
| Make sure to set the power cable retention clips properly. |
Ensure that power supply LEDs are lit.
V 1 2008.08 | Installation Guide | Bosch Security Systems |