Remote Mounting the Setback Control

Measure Wire for Remote Mounting

Step 5: Measure and cut (3) pieces of 18 AWG wire to a sufficient length to reach from the backplate on the Setback Control Junction Box Assembly to the Setback Control Protective Plate. This is shown in Figure 11.

18 AWG

Wire

Figure 11

Label the Wires for Remote Mounting

Step 6: Label the (3) cut wires (A), (B), and (C) respectively. Label both ends of the wires. This is shown in Figure 12. Masking tape can be used to label the wires.

Figure 12

Label Each

Wire

-11-

Page 11
Image 11
Bradford-White Corp 47808A, 238-47808-00A Measure Wire for Remote Mounting, Label the Wires for Remote Mounting