SERVICE PROCEDURE RG-IX
ScreenLok®Flame Arrestor Cleaning
Step 1. Rotate knob of combination thermostat gas valve to the off position.
Step 2. Remove outer jacket door.
Step 3. Remove inner do or per SERVICE PROCEDURE R G-I, step 3a through 3e.
Step 4. Disconnect main burner feed line, pilot tube and thermocouple/thermopile
from combination thermostat gas v alve and remove burner assembly
from combustion chambe r.
NOTE: Feedline nut for natural gas control uses right hand threads,
LP control uses left hand thread.
Step 5. Clean ScreenLok®Flame Arrestor using stiffbrush, compressed air and/or shop vacuum to remove any scale or
other debris accumulation. Using a soft brush, clear jacket openings of any dirt, dust, restrictions or other obstructions.
Step 6. Remove any debris from burner assembly per SERVICE PROCEDURE RG-V and reinstall burner assembly
into combustion chamber .
Step 7. Reconnect feedline, thermocouple and pilot tube to the combination thermostat/gas valve.
Step 8 Reinstall inner door per SERVICE PROCEDURE RG-I, steps 4 through 13.
Step 9. To resume op eration follow the instr uctions located on the lighting instruction label or the lighting i nstruction
located inthe installation and operation manual.
The Bradford White
DEFENDER
Safety System®
ScreenLok®Flame Arrestor Cleaning
ForWhite Rodgers Control,
depress knobslightly androtate
clockwise to the “OFF” position.
For Robertshaw Control, rotate
knob clockwise to the“OFF”
position.
Feedline
Nut
For Honeywell Control, rotate
knob counter-clockwise to t he
“OFF” position.
36
36
36