Assure grounding electrode conductor is connected and bonded per applicable federal, state and local codes, standards and regulations.
To Transfer Switch

Power Wiring Interconnections

NOTICE Improper installation could cause damage to the circuit boards and shorten their life. Installing circuit boards in live circuits will damage the board and is not covered by warranty. ALWAYS disconnect ALL sources of power prior to servicing.

• Remove all power prior to installing this equipment. Failure to do so could cause internal damage to the board when making electrical connections.

• Turn generator to OFF position.

• Turn off utility power to the standby generator and transfer switch.

NOTICE All wiring must be the proper gauge, properly supported and protected by conduit. All wiring should be done per applicable federal, state and local codes, standards and regulations. Obey wire type and torque specifications printed on the terminal blocks, neutral/ground connectors, and installation instructions. Approved for copper and aluminum conductors.

9.Connect main distribution panel ground to transfer switch “GND” terminal.

 

44

11

 

 

Generator

 

 

0

Circuit

 

22

Breaker

 

Ground

 

 

Neutral

Ground

Line 1

Line 2

Neutral

 

WARNING Shock Hazard. Installing low and high

 

 

 

 

 

voltage wire in same conduit could result in death,

10.

Connect feeder conductors from transfer switch

 

 

serious injury and/or property damage.

 

• Do not run low and high voltage wire in the same conduit

 

breaker “GENERATOR CO

NECTION” terminals to

 

generator circuit breaker LI

E1 and LINE2 terminals.

unless the insulation rating on ALL wiring is rated for

 

Each conductor must pass through hole of current

600V. See NEC for more information.

 

transformer before making connection.

 

Use installer supplied 300VAC or greater wire of a gauge that

11.

Plug current transformer leads into “CT1” and “CT2”

complies with the latest version of the National Electric Code

 

terminals ( ) on transfer switch control board.

 

to complete the following connections between utility power,

 

 

 

 

 

NOT

 

 

 

 

transfer switch, generator, main distribution panel, and

 

DPSW1

 

 

optional remote modules. Apply the necessary correction

 

 

 

 

factors and wire size calculations.

FOR

 

 

 

 

1.

Set generator’s circuit breaker to OFF position.

 

 

 

 

2.

Set generator’s system switch to FF position.

 

DPSW2

 

 

3.

Remove 15 Amp fuse from generator control panel.

 

 

 

 

 

 

 

4.

Turn off utility power to the standby generator and

 

 

 

 

 

transfer switch.

 

 

 

 

 

5.

Connect utility service to transfer switch’s utility

 

 

 

CT1

 

service disconnect circuit breaker terminalsREPRODmarked UCTION

C

 

“UTILITY CONNECTION”.

 

 

J6

CT2

6.

Connect utility service neutral to transfer switch

 

 

 

J5

 

 

neutral terminal.

 

 

J4

 

 

7.Connect main distribution panel feeder conductors to transfer switch terminals marked

“LOAD CONNECTION”.

8. NOTICE Connect main distribution panel neutral to

 

J3

 

transfer switch neutral terminal.

 

 

 

J2

 

 

 

 

 

 

 

 

J1

 

 

 

10

BRIGGSandSTRATTON.COM