COMBUSTION-AIR INTAKE HOUSING PLUG FITTING

The combustion-air intake plug fitting must be installed in unused combustion-air intake housing. This fitting must be attached by using RTV sealant, or by drilling a 1/8-in. hole in fitting, using hole in intake housing as a guide. Install a field-supplied No. 6 or No. 8 sheet metal screw.

NOTE: DO NOT OVERTIGHTEN SCREW. Breakage to intake housing or fitting may cause air leakage to occur.

A plugged drain connection has been provided on this fitting for use when moisture is found in combustion-air intake pipe and combustion box.

NOTE: Moisture in combustion-air intake may be result of improper termination. Ensure combustion-air intake pipe is similar to that shown in Fig. 31, 32, 33, 34, or 35 so it will not be susceptible to areas where light snow or other sources of moisture could be pulled in.

If use of this drain connection is desired, drill out fitting's tap plug with a 3/16-in. drill and connect a field-supplied 3/8-in. tube. This tube should be routed to open condensate drain for furnace and A/C (if used), and should be trapped. (See Fig. 30.)

COMBUSTION – AIR

INTAKE HOUSING

3/8" ID TUBE

BURNER

 

BOX

WARNING: Vent pipe must be installed and fully seated against inducer housing. Clamp must be tightened to prevent any condensate leakage. Failure to follow this warning could result in electrical shock, fire, personal injury, or death.

NOTE: A 2-in. diameter pipe must be used within the furnace casing. Make all pipe diameter transitions outside furnace casing.

3.Working from furnace to outside, cut pipe to required length(s).

4.Deburr inside and outside of pipe.

5.Chamfer outside edge of pipe for better distribution of primer and cement.

6.Clean and dry all surfaces to be joined.

7.Check dry fit of pipe and mark insertion depth on pipe.

NOTE: It is recommended that all pipes be cut, prepared, and preassembled before permanently cementing any joint.

8.

After pipes have been cut and preassembled, apply gener-

 

ous layer of cement primer to pipe fitting socket and end of

 

pipe to insertion mark. Quickly apply approved cement to

 

end of pipe and fitting socket (over primer). Apply cement

 

in a light, uniform coat on inside of socket to prevent

 

buildup of excess cement. Apply second coat.

9.

While cement is still wet, twist pipe into socket with 1/4

 

turn. Be sure pipe is fully inserted into fitting socket.

10.

Wipe excess cement from joint. A continuous bead of

3/16"

DRILL

TRAP

TO OPEN

DRAIN

4″￿

MIN

COMBUSTION – AIR PIPE

 

cement will be visible around perimeter of a properly made

 

joint.

11.

Handle pipe joints carefully until cement sets.

12.

Support combustion-air and vent piping a minimum of

 

every 5 ft (3 ft for SDR-21 or -26 PVC) using perforated

 

metal hanging strap.

13.

Slope combustion-air and vent pipes toward furnace a

 

minimum of 1/4 in. per linear ft with no sags between

 

hangers.

14.

Use appropriate methods to seal openings where vent and

Fig. 30ÐIntake Housing Plug Fitting Drain

A93035

combustion-air pipes pass through roof or sidewall.

III. CONCENTRIC VENT AND COMBUSTION-AIR

TERMINATION KIT INSTALLATION

2.Attach vent pipe as follows:

a.Determine location of vent pipe connection to inducer housing as shown in Fig. 28 for application.

b.Reposition neoprene inducer housing outlet cap and clamp to appropriate unused inducer housing connec- tion. Tighten clamp.

WARNING: Inducer housing outlet cap must be in- stalled and fully seated against inducer housing. Clamp must be tightened to prevent any condensate leakage. Failure to follow this warning could result in electrical shock, fire, personal injury, or death.

c.Install pipe support (factory-supplied in loose parts bag) into selected furnace casing vent pipe hole. Pipe support should be positioned to bottom of casing hole.

d.Insert 2-in. diameter pipe into inducer housing through neoprene coupling and clamp in inducer housing. Tighten clamp.

Ð26Ð

NOTE: If these instructions differ from those packaged with termination kit, follow kit instructions.

Combustion-air and vent pipes must terminate outside structure. A factory accessory termination kit must be installed in 1 of the installations shown in Fig. 31, 32, 33, 34, or 35. Four termination kits are available.

1.The 2-in. termination bracket kit is for 1-in., 1-1/2 in., and 2-in. diameter 2-pipe termination systems.

2.The 3-in. termination bracket kit is for 2-1/2 in. and 3-in. diameter 2-pipe termination systems.

3.The 2-in. concentric vent/air termination kit is for 1-in., 1-1/2 in., 2-in., and 2-1/2 in. diameter pipe systems when single penetration of wall or roof is desired.

4.The 3-in. concentric vent/air termination kit is for 2-1/2 in. and 3-in. diameter pipe systems when single penetration of wall or roof is desired.

NOTE: Shaded parts in Fig. 31, 32, 33, 34, and 35 are considered to be terminations. These components should NOT be counted when determining pipe diameter. Roof termination is preferred since it is less susceptible to damage, has reduced chances to intake

Page 26
Image 26
Bryant 355M-40-4, 355M-40-5 COMBUSTION-AIR Intake Housing Plug Fitting, III. Concentric Vent and COMBUSTION-AIR

355M-40-4, 355M-40-5 specifications

The Bryant 355M-40-5 and 355M-40-4 are innovative CNC cylindrical grinders designed to meet the demands of precision machining in various industrial applications. These machines stand out due to their robust construction, advanced technology, and versatile functionalities, which are critical for achieving high-quality grinding results.

One of the main features of the Bryant 355M-40-5 and 355M-40-4 is their precision grinding capability. With high spindle speeds and excellent rigidity, these grinders are engineered to deliver superior surface finishes even on complex geometries. The machines are equipped with advanced dressing systems that ensure consistent wheel profiles, enhancing performance and reducing cycle times.

The Bryant 355M-40-5 differentiates itself through its multi-axis capability, allowing for the grinding of intricate shapes and features without the need for extensive setup changes. Operators can easily program complex grinding sequences through the user-friendly interface, which supports both manual and automated operations. This flexibility is crucial in manufacturing environments that require quick turnaround times and adaptability to various workpieces.

Meanwhile, the Bryant 355M-40-4 focuses on efficiency and productivity, featuring a streamlined design that optimizes workflow. The machine is fitted with high-precision linear guides and ball screws, ensuring smooth and accurate movements during the grinding process. This results in minimal wear and tear, thereby extending the machine's lifespan and maintaining accuracy over time.

Key technologies incorporated into both models include state-of-the-art control systems that enable real-time monitoring and feedback during operations. This feature allows operators to make on-the-fly adjustments to optimize grinding parameters, leading to improved performance and reduced scrap rates. Additionally, the integration of automation solutions, such as robotic loading systems, enhances productivity by minimizing downtime and labor costs.

The Bryant 355M-40-5 and 355M-40-4 are built with durability in mind, utilizing high-strength materials that resist deformation and wear. Their thermal stability ensures consistent performance even under varying operating conditions, making them a reliable choice for high-volume production.

In summary, the Bryant 355M-40-5 and 355M-40-4 models are exemplary CNC cylindrical grinders that combine precision, efficiency, and advanced technology. Their features make them suitable for a wide range of grinding applications, from tool manufacturing to automotive components, ensuring that they remain competitive in the ever-evolving landscape of manufacturing technology.