TABLE 7ÐMAXIMUM ALLOWABLE EXPOSED VENT PIPE LENGTH (FT) WITH INSULATION IN WINTER DESIGN

TEMPERATURE AMBIENT*

UNIT

WINTER DESIGN

MAXIMUM PIPE

 

INSULATION THICKNESS (IN.)²

 

TEMPERATURE

DIAMETER

 

 

 

 

 

SIZE

0

3/8

1/2

3/4

1

(°F)

(IN.)

 

 

20

2

21

37

42

50

57

042040

 

 

 

 

 

 

 

0

2

10

22

25

30

35

 

-20

2

5

14

17

21

25

 

20

2

30

55

61

70

70

042060

 

 

 

 

 

 

 

0

2

16

33

38

46

53

 

-20

2

9

23

26

33

38

042080

20

2

37

65

70

70

70

 

 

 

 

 

 

 

0

2

20

39

45

55

63

060080

-20

2

11

27

31

39

45

 

 

20

2-1/2

41

70

70

70

70

060100

0

2-1/2

21

42

48

59

68

 

-20

2-1/2

11

28

33

41

49

 

20

3

49

70

70

70

70

060120

0

3

26

51

58

70

70

 

-20

3

15

35

40

50

59

 

 

 

 

 

 

 

 

*Pipe length (ft) specified for maximum pipe lengths located in unconditioned spaces. Pipes located in unconditioned space cannot exceed total allowable pipe length as specified in Table 6.

² Insulation thickness based on R value of 3.5 per in.

contaminants, and has less visible vent vapors. (See Fig. 31 or 32.) Sidewall termination may require sealing or shielding of building surfaces with a corrosive resistance material due to corrosive combustion products of vent system.

A.Extended Exposed Sidewall Pipes

Sidewall combustion-air and vent pipe terminations may be extended beyond area shown in Fig. 34 or 35 in outside ambient by insulating pipes as indicated in Table 7.

1.Determine combustion-air and vent pipe diameters, as stated above, using total pipe length and number of elbows.

2.Using winter design temperature (used in load calculations), find appropriate temperature for your application and fur- nace model.

3.Determine required insulation thickness for exposed pipe lengths.

NOTE: Pipe length (ft) specified for maximum pipe lengths located in unconditioned spaces cannot exceed total allowable pipe length as specified in Table 6.

B.Two-Pipe Termination Kit

1.Determine location for termination.

Consideration of the following should be made when determining an appropriate location for termination kit.

a.Comply with all clearance requirements as stated in Table 5.

b.Termination kit should be positioned where vent vapors will not damage plants/shrubs or air conditioning equip- ment.

c.Termination kit should be positioned so it will not be affected by wind eddy (such as inside building corners) or accumulation of airborne leaves or light snow, or allow recirculation of flue gases.

d.Termination kit should be positioned where it will not be damaged by or subjected to foreign objects, such as stones, balls, etc.

e.Termination kit should be positioned where vent vapors are not objectionable.

2.Cut 2 holes, 1 for each pipe, of appropriate size for pipe size being used.

3.Loosely install elbow in bracket and place assembly on combustion-air pipe.

Ð28Ð

Roof terminationsÐLoosely install pipe coupling on prop- erly cut vent pipe. Coupling must be positioned so bracket will mount as shown in Fig. 31.

For applications using combustion-air pipe option indicated by dashed lines in Fig. 31, install 90° street elbow into 90° elbow, making U-fitting. A 180° U-fitting may be used.

Sidewall terminationsÐInstall bracket as shown in Fig. 34 or 35.

For applications using vent pipe option indicated by dashed lines in Fig. 34, rotate vent elbow 90° from position shown in Fig. 34.

4.Disassemble loose pipe fittings. Clean and cement using same procedures as used for system piping.

5.Check required dimensions as shown in Fig. 31, 34, or 35.

C.Concentric Vent/Air Termination Kit

1.Determine location for termination.

Consideration of the following should be made when determining an appropriate location for termination kit.

a.Comply with all clearance requirements as stated in Table 5.

b.Termination kit should be positioned where vent vapors will not damage plants/shrubs or air conditioning equip- ment.

c.Termination kit should be positioned so it will not be affected by wind eddy (such as inside building corners) or accumulation of airborne leaves or light snow, or allow recirculation of flue gases.

d.Termination kit should be positioned where it will not be damaged by or subjected to foreign objects, such as stones, balls, etc.

e.Termination kit should be positioned where vent vapors are not objectionable.

2.Cut one 4-in. diameter hole for 2-in. kit, or one 5-in. diameter hole for 3-in. kit.

3.Loosely assemble concentric vent/air termination compo- nents together using instructions in kit.

4.Slide assembled kit with rain shield REMOVED through hole.

Page 28
Image 28
Bryant 355M-40-4, 355M-40-5 Extended Exposed Sidewall Pipes, Two-Pipe Termination Kit, Concentric Vent/Air Termination Kit

355M-40-4, 355M-40-5 specifications

The Bryant 355M-40-5 and 355M-40-4 are innovative CNC cylindrical grinders designed to meet the demands of precision machining in various industrial applications. These machines stand out due to their robust construction, advanced technology, and versatile functionalities, which are critical for achieving high-quality grinding results.

One of the main features of the Bryant 355M-40-5 and 355M-40-4 is their precision grinding capability. With high spindle speeds and excellent rigidity, these grinders are engineered to deliver superior surface finishes even on complex geometries. The machines are equipped with advanced dressing systems that ensure consistent wheel profiles, enhancing performance and reducing cycle times.

The Bryant 355M-40-5 differentiates itself through its multi-axis capability, allowing for the grinding of intricate shapes and features without the need for extensive setup changes. Operators can easily program complex grinding sequences through the user-friendly interface, which supports both manual and automated operations. This flexibility is crucial in manufacturing environments that require quick turnaround times and adaptability to various workpieces.

Meanwhile, the Bryant 355M-40-4 focuses on efficiency and productivity, featuring a streamlined design that optimizes workflow. The machine is fitted with high-precision linear guides and ball screws, ensuring smooth and accurate movements during the grinding process. This results in minimal wear and tear, thereby extending the machine's lifespan and maintaining accuracy over time.

Key technologies incorporated into both models include state-of-the-art control systems that enable real-time monitoring and feedback during operations. This feature allows operators to make on-the-fly adjustments to optimize grinding parameters, leading to improved performance and reduced scrap rates. Additionally, the integration of automation solutions, such as robotic loading systems, enhances productivity by minimizing downtime and labor costs.

The Bryant 355M-40-5 and 355M-40-4 are built with durability in mind, utilizing high-strength materials that resist deformation and wear. Their thermal stability ensures consistent performance even under varying operating conditions, making them a reliable choice for high-volume production.

In summary, the Bryant 355M-40-5 and 355M-40-4 models are exemplary CNC cylindrical grinders that combine precision, efficiency, and advanced technology. Their features make them suitable for a wide range of grinding applications, from tool manufacturing to automotive components, ensuring that they remain competitive in the ever-evolving landscape of manufacturing technology.