Manuals
/
Bryant
/
Household Appliance
/
Air Conditioner
Bryant
619CNF, 619CNQ
installation instructions
Cooling System Wiring Diagram
Models:
619CNQ
619CNF
1
16
24
24
Download
24 pages
52.51 Kb
13
14
15
16
17
18
19
20
Troubleshooting
Install
Cooling System Wiring Diagram
Maintenance
Problem Cause Typical Solution
III. Adjusting Airflow
Checklist
Weight
Line Power Connections
Service Training
Page 16
Image 16
538A 619CNF,CNQ
619CNF,CNQ
538A
a40-1636
Fig. 20 — Cooling System Wiring Diagram
—16—
Page 15
Page 17
Page 16
Image 16
Page 15
Page 17
Contents
Safety Considerations
Contents
Installation
System Matches
Application Range
System Type Indoor Section Number Outdoor Section Number
Cooling
Complete PRE-INSTALLATION Checks
Before Installation
Physical Data, Under Ceiling Cooling Only Units
Unpack Unit
II. Select Location
Physical Data, Under Ceiling Heat Pump Units
Unit Size
Weight lb
Unit
Size
Ft-in
III. Mount Unit
Installing Hex-Head Mounting Bolts Fan Coil Unit
IV. Connect Refrigerant Piping
Connect Condensate Drain Line
Piston and Charge Combinations Cooling Only Systems
Piston and Charge Combinations Heat Pump Systems
Piston and Charge Combinations Heat and Cool Systems
AccuRater Metering Device at Service Valve
Mounting Hanging Brackets
VI. Make Electrical Connections
Electrical Data
Component Location Typical Ceiling-Suspended System
VII. Install Thermostat
Line Power Connections
ASM
ASR
Tran
FPT
Thermostats
VIII. Make Connections Between Indoor and Outdoor Units
Check AccuRater Metering Device
Cooling Only Systems
Heat Pump Systems
Cooling System Wiring Diagram
Heat Pump Wiring Diagram
III. Adjusting Airflow
IV. Operating Mode Memory
Automatic Operation AUTO. Mode
START-UP
Lubrication
Cleaning and Maintenance
II. AIR Filters FIG
III. Clean Indoor Unit Bottom Panel
IV. Clean Indoor Coil
Clean Outdoor Coil Outdoor Unit
VI. Clean Condensate Drains
Troubleshooting
Problem Cause Typical Solution
Service Training
Call for Free Catalog
II. PRE-START-UP
START-UP Checklist Preliminary Information
III. Piping
START-UP Checklist
IV. START-UP
Top
Page
Image
Contents