Manuals
/
Bryant
/
Household Appliance
/
Air Conditioner
Bryant
619CNQ, 619CNF installation instructions Heat Pump Wiring Diagram, a40-1637
Models:
619CNQ
619CNF
1
17
24
24
Download
24 pages
52.51 Kb
14
15
16
17
18
19
20
21
<
>
Troubleshooting
Install
Cooling System Wiring Diagram
Dimension
Maintenance
Routing Wires Over Piping
III.ADJUSTING AIRFLOW A. Automatic Air Sweep
Checklist
Line Power Connections
Service Training
Page 17
Image 17
538B 619CNQ
619CNQ 538B
a40-1637
Fig. 21 — Heat Pump Wiring Diagram
—17—
Page 16
Page 18
Page 17
Image 17
Page 16
Page 18
Contents
I. Step 1 — Complete Pre-Installation
CONTENTS
SAFETY CONSIDERATIONS
INSTALLATION
Table 2 — Application Range
Table 1 — System Matches
C. Before Installation
I. STEP 1 - COMPLETE PRE-INSTALLATIONCHECKS
A. Unpack Unit
B. Inspect Shipment
II. STEP 2 — SELECT LOCATION
b40-437
Fig. 3 — Base Unit Dimensions
III. STEP 3 — MOUNT UNIT
Fig. 4 — Fan Coil Unit Clearances
A. Wooden Structure
B. Newly Built Concrete Slab
Fig. 7 — Fan Coil Unit Hanging Dimensions
Fig. 6 — Installing Hex-HeadMounting Bolts
F. To Install Thermostat
in Fan Coil Unit
V.STEP 5 — CONNECT CONDENSATE DRAIN LINE
Fig. 10 - Mounting Hanging Brackets
Fig. 12 — Routing Wires Over Piping
Bypass Type Components
Fig. 11 — Hanging Fan Coil Unit
Table 5 — Electrical Data
VI. STEP 6 — MAKE ELECTRICAL CONNECTIONS
a40-1635
—11—
Fig. 15 — Routing Drain Piping
VII. STEP 7 — INSTALL THERMOSTAT
Fig. 16 — Line Power Connections
a40-941
Fig. 17 — Control Circuit Connections Arrangement
—13—
a40-1385
Fig. 18 — Thermostats
a40-1386
a40-1384
B. Cooling Only Systems
A. Check AccuRater Metering Device
C. Heat Pump Systems
Fig. 19 — AccuRater Bypass Type
a40-1636
Fig. 20 — Cooling System Wiring Diagram
—16—
a40-1637
Fig. 21 - Heat Pump Wiring Diagram
START-UP
III.ADJUSTING AIRFLOW A. Automatic Air Sweep
I.AFTER EXTENDED SHUTDOWN
II. SEASONAL CHANGEOVERS
B. Clean Or Replace Filters
CLEANING AND MAINTENANCE
Table 6 — Cleaning and Maintenance Schedule
E. System Safeties
IV. CLEAN INDOOR COIL
III. CLEAN INDOOR UNIT BOTTOM PANEL
V. CLEAN OUTDOOR COIL OUTDOOR UNIT
VI. CLEAN CONDENSATE DRAINS
—21—
Table 7 — Troubleshooting
CALL FOR FREE CATALOG
SERVICE TRAINING
I. PRELIMINARY INFORMATION
START-UPCHECKLIST
II. PRE-START-UP
III. PIPING
START-UPCHECKLIST cont IV. START-UP