START-UP CHECKLIST (cont)

IV. START-UP

IF UNIT HAS A CRANKCASE HEATER, HAS IT BEEN ON FOR 24 HOURS? ____________

MEASURE AND RECORD THE:

AIR ENTERING OUTDOOR UNIT: ____________ F

AIR ENTERING INDOOR UNIT: ____________ F

DISCHARGE LINE TEMPERATURE: ____________ F

VAPOR LINE TEMPERATURE: ____________ F

MEASURE AND RECORD THE:

VAPOR LINE PRESSURE: ____________ PSIG

DISCHARGE PRESSURE: ____________ PSIG

CUT ALONG DOTTED LINE

CUT ALONG DOTTED LINE

Copyright 2006 Bryant Heating & Cooling Systems

Printed in U.S.A.

CL-2

6-06A

CATALOG NO. 02-619C0001-II

Page 24
Image 24
Bryant 619CNF, 619CNQ installation instructions START-UP Checklist, Iv. Start-Up