Bunn 34766.0000S Selecting The Correct Pump Tubing, Dispense, Rate, 1.8 Oz/sec, 3/16” I.D. TUBING

Models: 34766.0000S

1 34
Download 34 pages 23.55 Kb
Page 8
Image 8
SELECTING THE CORRECT PUMP TUBING

SELECTING THE CORRECT PUMP TUBING

There are two pump tube sizes available for use with this dispenser. To determine the correct tubing for you application, first determine the dispenser flow rate you intend to use, refer to Setting Dispenser Flow Rate. Then look up the recommended tube size for the mix ratio of your concentrate, refer to the Tube Selection Chart.

 

 

 

 

 

 

TUBE SELECTION CHART

 

 

 

 

 

 

 

 

 

 

Dispense

Concentrate Ratios

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Rate

25

30

35

40

45

50

55

60

65

70

75

 

80

85

90

 

95

100

 

1.8 Oz/sec.

3/16” I.D. TUBING

 

 

 

 

1/8” I.D. TUBING

 

 

 

 

 

 

(53 ml/sec.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.5 Oz/sec.

3/16” I.D. TUBING

 

 

 

 

 

 

 

1/8” I.D. TUBING

 

 

 

(74 ml/sec.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Examples:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.For a Dispenser Flow Rate of 2.5 Oz./sec (74 mL/sec) and a Mix Ratio of 35:1 – use 3/16” I.D. Tubing.

2.For a Dispenser Flow Rate of 1.8 Oz./sec (53 mL/sec) and a Mix Ratio of 60:1 – use 1/8” I.D. Tubing.

Tube kits can be purchased from BUNN-O-MATIC.

Part # 34727.1000 for 3/16” I.D. Tubing or #34728.1000 for 1/8” I.D. Tubing.

INSTALLING THE PUMP TUBING (Refer to the Tubing Installation Instructions in side the cabinet door for details.)

1.Loosen the thumbscrew securing the tubing retainer plate to the pump housing. Set it and the retainer plate aside.

2.Depress the tension screw and remove it from the notch in the pump body, releasing the spring tension on the pump band.

3.Apply lubricant (BUNN-O-MATIC part number M2531.0001) to the new pump tubing.

4.Insert the tubing onto the mix chamber port and wrap the tubing around the pump rotor, making sure that the elbow and clamps end up on the bottom side of the pump body.

5.Close the compression band reinsert the tension screw into the notch in the pump housing.

6.Replace the tubing retainer plate and tighten the thumbscrew.

7.Reconnect bag connector to the product box.

8.Repeat steps 1 through 7 for the other pump.

9.Prime the pumps. Refer to Priming the Concentrate Lines section.

Thumbscrew

 

 

 

 

 

 

 

 

 

 

 

 

 

Tension

 

 

 

 

2.0”

 

 

 

 

 

2.0”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

Lubricate between arrows

 

 

Remove Retaining Plate Release Spring Tension

Remove Tubing

 

 

Lubricate New Tube

Tension Screw

 

Tube Clamp

 

Install New Tubing

Completed Installation

8

34766 112502

 

Page 8
Image 8
Bunn 34766.0000S manual Selecting The Correct Pump Tubing, Dispense, Rate, 1.8 Oz/sec, 3/16” I.D. TUBING, 1/8” I.D. TUBING