Bunn CDBC, CEZF service manual SERVICE cont TANK HEATER Cont

Models: CEZF CDBC

1 34
Download 34 pages 50.46 Kb
Page 30
Image 30
SERVICE (cont.)

SERVICE (cont.)

TANK HEATER (Cont.)

17.Install tank assembly onto mounting brackets and secure in place with four #8-32 nuts.

18.Install tank lid and secure in place with eight #8-32 nuts.

19.Connect the two white wires of the tank warmer blanket.

20.Connect the limit thermostat to the front of the tank assembly.

21.Connect the green wire to the tank mounting bracket using #8-32 nut.

22.Connect the pink wire to the level probe.

23.Insert the temperature probe through the grom- met in the tank lid.

24.Install the elbow fitting of the vent hose into the grommet in the tank lid.

25.On brewers with faucet, connect the outlet water line of the faucet to the side of the tank and secure with clamp.

26.Connect the water supply tube from the solenoid to the bottom of the tank and secure with clamp.

27.Connect the water supply tube from the dispense valve to the side of the tank and secure with clamp.

28.Refer to FIG. 14 when reconnecting the tank heater wires.

29.Install access panels and covers and refer to Initial Set-upfor refill and operation.

BLK to Control Board

WHI or RED to Terminal

Block

P1856

FIG. 14 TANK HEATER WIRING

Page 30

29253 091603

 

Page 30
Image 30
Bunn CDBC, CEZF service manual SERVICE cont TANK HEATER Cont