Bunn CDBC Electrical Requirements, Plumbing Requirements, Electrical Hook-Up, Plumbing Hook-Up

Models: CEZF CDBC

1 34
Download 34 pages 50.46 Kb
Page 4
Image 4
ELECTRICAL REQUIREMENTS

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.

Model 15 has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.

WHITE

Electrical Hook-UpNEUTRAL

120V.A.C.

L2 RED

WHITE

120V.A.C.

208 or 240V.A.C.

L1 BLACK

PLUMBING REQUIREMENTSNEUTRAL

Plumbing Hook-UpL1 BLACK

120V.A.C.

Model 20 requires 2-wire, grounded service rated

120 volts ac, 20 amp, single phase, 60 Hz. Proceed as follows:

Model 35 requires 3-wire, grounded service rated 120/208 or 120/240 volts ac, 20 amp, single phase, 60 Hz. Proceed as follows:

Electrical Hook-Up

CAUTION Ð Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.Remove the front panel beneath the sprayhead.

4.Feed the cord through the strain relief and connect it to the terminal block.

5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace the front panel.

6.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial Set-Up.

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 5 and 90 psi (34.5 and 620 kPa) for CDBC models and 20 and 90 psi (138 and 620 kPa) for CEZ models from a 1Ú2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 3Ú8" flare. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized water supply to this equipment.

NOTE - Bunn-O-Matic recommends 1Ú4" copper tubing for installations of less than 25 feet and 3Ú8" for more than 25 feet from the 1Ú2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the

Building Officials and Code Administrators International, Inc. (BOCA)

and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

Plumbing Hook-Up

1.Flush the water line.

2.Securely attach it to the flare fitting at the rear of the brewer.

3.Turn on the water supply.

Page 4

29253 091603

 

Page 4
Image 4
Bunn CDBC, CEZF service manual Electrical Requirements, Plumbing Requirements, Electrical Hook-Up, Plumbing Hook-Up