Bunn CDBC APS-DV, CDBCF-DV, CDBC-MV, CDBC-DV, CDBCF APS-MV, CDBCF APS-DV, CDBCF-MV Operating Controls

Models: CDBCF-MV CDBCF APS-DV CDBCF APS-MV CDBC-DV CDBC-MV CDBC APS-DV CDBCF-DV

1 37
Download 37 pages 654 b
Page 8
Image 8
OPERATING CONTROLS

OPERATING CONTROLS

P1626

ON/OFF SWITCH

Pressing the "ON/OFF" switch (indicator glowing) supplies power to the brew station warmer, enables the brew circuit, and energizes the tank refill circuit. Pressing the switch again (indicator not glowing) stops tank refilling and brewing and de-energizes the brew station warmer. Stopping a brew cycle after it has been started will not stop the flow of water into the decanter until the funnel is empty.

NOTE Hot water will be available at the faucet in a limited amount when the "ON/OFF" switch is in the "OFF" position because the tank will not refill.

BREW SWITCH

Momentarily pressing and releasing the switch starts a brew cycle when the "ON/OFF" indicator is glowing. NOTE The "ON/OFF" indicator must be glowing to initiate and complete a brew cycle.

ADDITIONAL WARMER SWITCHES

Pressing any additional warmer switch so that the indicator is glowing, supplies power to the associated warmer.

READY INDICATOR

This indicator glows when the preset temperature has been achieved. The word "NOT" above "READY" will glow in all other instances.

TEMPERATURE INDICATORS (Feature disabled from the factory – refer to page 8.)

The indicator glows to communicate the brew water temperature. Two indicators will glow when the temperature is between them.

Page 8

29707 112801

 

Page 8
Image 8
Bunn CDBC APS-DV, CDBCF-DV, CDBC-MV, CDBC-DV, CDBCF APS-MV, CDBCF APS-DV, CDBCF-MV service manual Operating Controls