Bunn S/N CDBC020213, CDBCFP, CDBCP service manual SERVICE cont REFILL VALVE

Models: CDBCP CDBCFP CDBCF S/N CDBC020213

1 35
Download 35 pages 47.44 Kb
Page 29
Image 29
SERVICE (cont.)

SERVICE (cont.)

REFILL VALVE

P1857

FIG. 10 REFILL VALVE

Location:

The refill valve is located inside the trunk on the lower center part of the component bracket.

Test Procedures:

1.Disconnect the brewer from the power source.

2.Disconnect the white and white/blue wires from the refill valve. Set the "ON/OFF" switch in the "ON" upper position.

3.With a voltmeter, check the voltage across the coil wires. Connect the brewer to the power source. The indication must be 120 volts ac for two wire 120 volt models and three wire 120/240 volt models.

4.Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5.

If voltage is not present as described, refer to Wiring Diagrams and check brewer wiring harness.

5.Check for continuity across the refill valve coil terminals.

If continuity is present as described, reconnect the white and white/blue wires from the circuit board.

If continuity is not present as described, replace the refill valve.

6.Check the refill valve for coil action. Connect the brewer to the power source. With "ON/OFF" switch in the "ON' upper position press start switch and listen carefully in the vicinity of the refill valve for a" clicking" sound as the coil magnet attracts.

7.Disconnect the brewer from the power source.

If the sound is heard as described and water will not pass through the refill valve, there may be a blockage in the water line before the refill valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles.

If the sound is not heard as described, replace the refill valve.

Removal and Replacement:

1.Remove both wires from the refill valve.

2.Turn off the water supply to the brewer.

3.Disconnect the water lines to and from the refill valve.

4.Remove the two 1/4"-20 screws securing the refill valve mounting bracket to the component bracket. Remove bracket and valve as an assembly.

5.Using two 1/4"-20 screws install the new refill valve and bracket to the component bracket.

6.Securely fasten the water lines to and from the valve.

7.Refer to FIG. 11 when reconnecting the wires.

WHI from Terminal

Block

WHI/BLU from

Control Board

P1858

FIG. 11 REFILL VALVE WIRING

Page 29

35582 041503

 

Page 29
Image 29
Bunn S/N CDBC020213, CDBCFP, CDBCP service manual SERVICE cont REFILL VALVE