SERVICE
This section provides procedures for testing and replacing various major components used in this brewer should service become necessary. Refer to Troubleshooting for assistance in determining the cause of any problem.
WARNING - Inspection, testing, and repair of electri- cal equipment should be performed only by qualified service personnel. The brewer should be disconnected from the power source when servicing, except when electrical tests are required and the test procedure spe- cifically states to plug in the brewer.
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power source before the removal of any panel or the replace- ment of any component.
All components are accessible by the removal of the top cover and rear inspection panel.
The top cover is attached with four
The rear inspection panel is attached with six #8- 32 screws. Removal of the rear panel will allow access to the brew solenoid valve, dilution solenoid valve and the sweetener solenoid valve (optional), .195 GPM flow control and check valve.
Contents |
|
Brew Solenoid Valve | 16 |
Brew Timer (Early Models) | 17 |
Digital Brew Timer (Late Models) | 18 |
Control Thermostat | 20 |
Dilution Solenoid Valve | 21 |
Dilution Timer | 22 |
Limit Thermostat | 23 |
ON/OFF Switch | 24 |
Start Switch | 26 |
Sweetener Solenoid Valve (Optional) | 27 |
Tank Heater | 28 |
Wiring Diagrams | 29 |
T |
|
FIG. 1 COMPONENT ACCESS | P1187 |
|
Page 15 | 10225 | 031804 |
|
|