Bunn TU3 service manual SERVICE cont, Brew Solenoid Valve, solenoid valve

Models: TU3

1 32
Download 32 pages 6.71 Kb
Page 16
Image 16
SERVICE (cont.)

SERVICE (cont.)

If continuity is not present as described, replace the

BREW SOLENOID VALVE

solenoid valve.

 

 

 

6.

Check the solenoid valve for coil action. Connect

 

 

 

 

the brewer to the power source. With ON/OFF

 

 

 

 

switch in the "ON" upper position press start switch

 

 

 

 

and listen carefully in the vicinity of the solenoid

 

 

 

 

valve for a "clicking" sound

as the coil magnet

 

 

 

 

attracts.

 

 

 

 

 

7.

Disconnect the brewer from the power source.

 

 

 

If the sound is heard as described and water will not

 

 

 

pass through the solenoid valve, there may be a block-

 

 

 

age in the water line before the solenoid valve or, the

 

 

 

solenoid valve may require inspection for wear, and

 

 

 

removal of waterborne particles.

 

 

 

 

If the sound is not heard as described, replace the

 

 

 

solenoid valve.

 

 

 

FIG. 2 BREW SOLENOID VALVE

P1277.40

Removal and Replacement:

 

 

 

1.

Remove all wires from solenoid valves.

 

 

Location:

 

2.

Turn off the water supply to the brewer.

 

Viewing the brewer from the rear the brew sole-

3.

Disconnect the water lines to and from the sole-

noid valve is mounted on the left side of the mounting

 

noid valves.

 

 

bracket.

 

4.

Remove the two #8-32 keps nuts holding the

 

 

 

 

mounting bracket to the brewer base.

Test Procedures:

 

5.

Lift out the bracket.

 

 

1. Disconnect the brewer from the power source.

6.

Remove the two #10-32 slotted-head screws hold-

2. Disconnect the white/violet and white/green wires

 

ing the solenoid valve to the mounting bracket.

 

from the solenoid valve. With the ON/OFF switch

7.

Securely install the new solenoid valve to the

 

in the "ON" upper position press the start switch.

 

mounting bracket.

 

 

3.

With a voltmeter, check the voltage across the

8.

Attach the mounting bracket to the brewer base.

 

white/violet and white/green wires. Connect the

9.

Securely fasten the water lines to and from the

 

brewer to the power source. The indication must

 

solenoid valves.

 

 

 

be:

 

10.

Refer to the Fig.3 when reconnecting the wires

 

a) 120 volts ac for two wire 120 volt models.

 

 

 

 

 

b) 240 volts ac for two wire 240 volt models.

WHI/VIO to Dilution WHI/GRN to

 

 

 

c) 100 volts ac for two wire 100 volt models.

 

 

 

Solenoid

 

 

4. Disconnect the brewer from the power source,

 

Brew Timer TL4

WHI/VIO to Brew Solenoid

 

 

 

 

WHI/VIO to Brew Timer TL1

 

 

 

 

 

If voltage is present as described, proceed to #5

 

 

WHI/BLU to Dilution

If voltage is not present as described, refer to Wiring

 

 

Timer TL4

 

 

 

 

Diagrams and check brewer wiring harness.

 

BREW

 

WHI/VIO to Dilution

 

 

 

 

 

 

 

SOLENOID

 

Solenoid

5. Check for continuity across the solenoid valve coil

DILUTION

BRN/WHI to Selector

terminals.

Switch

 

 

 

SOLENOID

 

 

 

 

 

 

 

If continuity is present as described, reconnect the

 

SWEETENER

 

 

 

white/violet from the ON/OFF switch and white/green

 

SOLENOID (Optional)

 

 

 

 

 

 

P1278

wire from the brew timer.

 

FIG.3 SOLENOID VALVE TERMINALS

 

 

 

 

 

 

 

 

 

 

Page 16

 

 

10225

031804

 

 

 

 

 

Page 16
Image 16
Bunn TU3 service manual SERVICE cont, Brew Solenoid Valve, solenoid valve