SERVICE (cont.) | If continuity is not present as described, replace the |
BREW SOLENOID VALVE (HOT COFFEE) | solenoid valve. |
|
| 6. | Check the hot coffee solenoid valve for coil ac- |
|
|
| tion. Connect the brewer to the power source. With |
|
|
| TEA/OFF/COFFEE switch in the "COFFEE" position |
|
|
| press the START switch and listen carefully in the |
|
|
| vicinity of the solenoid valve for a "clicking" sound |
|
|
| as the coil magnet attracts. |
|
| 7. | Disconnect the brewer from the power source. |
|
| If the sound is heard as described and water will not | |
|
| pass through the solenoid valve, there may be a block- | |
|
| age in the water line before the solenoid valve or, the | |
|
| solenoid valve may require inspection for wear, and | |
|
| removal of waterborne particles. | |
|
| If the sound is not heard as described, replace the | |
|
| solenoid valve. | |
| P2198.50 | Removal and Replacement: | |
| FIG. 2 HOT COFFEE BREW SOLENOID VALVE | 1. | Remove all wires from solenoid valves. |
Location: | 2. | Turn off the water supply to the brewer. | |
| Viewing the brewer from the, rear the hot coffee | 3. | Disconnect the water lines to and from the sole- |
brew solenoid valve is mounted on the left side of the |
| noid valves. | |
mounting bracket. | 4. | Remove the two | |
|
|
| mounting bracket to the brewer base. |
Test Procedures: | 5. | Lift out the bracket. | |
1. Disconnect the brewer from the power source. | 6. | Remove the two | |
2. Disconnect the white/red and white/green wires |
| ing the hot coffee solenoid valve to the mounting | |
| from the hot coffee solenoid valve. With the TEA/ |
| bracket. |
| OFF/COFFEE switch in the "COFFEE" position press | 7. | Securely install the new hot coffee solenoid valve |
| the START switch. |
| to the mounting bracket. |
3. | With a voltmeter, check the voltage across the | 8. | Attach the mounting bracket to the brewer base. |
| white/red and white/green wires. Connect the | 9. | Securely fasten the water lines to and from the |
| brewer to the power source. The indication must |
| solenoid valves. |
| be 120 volts ac for two wire 120 volt models and | 10. | Refer to Fig. 3 when reconnecting the wires. |
| three wire 120/208 volt models. |
| WHI/GRN to Hot Coffee Timer TL4 |
4. | Disconnect the brewer from the power source. |
| WHI/RED to Hot Coffee Timer TL1 |
If voltage is present as described, proceed to #5
If voltage is not present as described, refer to Wiring
Diagrams and check brewer wiring harness.
5. Check for continuity across the hot coffee sole- | HOT COFFEE |
|
| |
noid valve coil terminals. | BREW SOLENOID |
|
| |
ICED TEA BREW |
|
| ||
|
|
| ||
If continuity is present as described, reconnect the | SOLENOID |
|
| |
| DILUTION |
| ||
white/red and white/green wires from the hot coffee |
|
| ||
| SOLENOID | P1364 | ||
brew timer. | FIG.3 SOLENOID VALVE TERMINALS | |||
| ||||
Page 15 | 10510 | 081599 | ||
|
|