Table 10: Sequence of Operation and Wiring Diagrams

Ignition System

Country

Fuel

Boiler Sizes

Wiring Diagram Figure

Sequence of

Continuous

Intermittent

Operation

 

 

 

 

Standing Pilot (24V)

USA &

Natural Gas

6 & 7 Sect.

Figure 29

Figure 30

Page 36

 

Canada

LP Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standing Pilot

USA &

Natural Gas

6 - 10 Sect.

Figure 31

Figure 32

Page 39

 

(OP - 120V)

Canada

LP Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standing Pilot

USA

LP Gas

8 - 10 Sec.

Figure 31

Figure 32

Page 39

(OP-CSD-1 - 120V

 

 

 

 

 

 

 

USA

Natural Gas

5 - 10 Sect.

Figure 33

Figure 34

 

 

 

 

Intermittent Ignition

LP Gas

Page 42

 

 

 

 

 

 

 

 

 

(Honeywell EI - 24V)

 

Natural Gas

5 - 10 Sect.

 

 

 

 

 

 

 

Canada

Figure 35

Figure 36

 

 

 

 

 

 

LP Gas

5 - 7 Sect.

 

 

 

 

 

 

 

 

 

 

 

 

 

Intermittent Ignition

USA &

Natural Gas

6 - 10 Sect.

Figure 37

Figure 38

Page 47

 

 

 

 

 

(EP - 120V)

Canada

LP Gas

 

Not Available

 

 

 

 

 

 

 

 

 

 

 

 

Intermittent Ignition

USA

Natural Gas

8 - 10 Sect.

Figure 37

Figure 38

Page 47

(EP-CSD-1 - 120V)

 

 

 

 

 

 

1.Standing Pilot (24) Sequence of Operation

a.Normal Operation

i.Thermostat or operating control calls for heat. Vent Damper (if used) opens.

ii.Gas valves are energized allowing main gas flow and ignition of main burners.

iii.Call or heat ends. Gas valves are de- energized, extinguishing main flame. Vent

Damper (if used) closes.

b.Safety Shutdown

i.Limit: Automatically interrupts main burner operation when water temperature exceeds set point. Maximum allowable temperature is 250°F. Circulator continues to operate with call for heat, Vent Damper (if used) closes. Normal operation resumes when water temperature falls below set point.

ii.Blocked Vent Switch: Automatically interrupts main burner operation when excessive flue gas spillage occurs.

Circulator continues to operate and Vent Damper (if used) remains open with call for heat. If blocked vent switch is activated do not attempt to place boiler in operation. Correct cause of spillage and reset blocked vent switch.

iii.Flame Roll-out Switch: Automatically interrupts main burner operation when flames or excessive heat are present in vestibule. Circulator continues to operate and Vent Damper (if used) remains open with call for heat. Control is single use device. If flame roll-out switch is activated, do not attempt to place boiler in operation.

Correct cause of spillage and replace flame roll-out switch.

iv.Thermocouple: Senses pilot flame and causes gas valves to turn off main burner and pilot burner gas flow should pilot burner flame extinguish. Circulator continues to operate and Vent Damper (if used) remains open with call for heat.

36

Page 36
Image 36
Burnham 8H manual Sequence of Operation and Wiring Diagrams