II.Boiler Assembly

A.Remove Crate

1.Remove all fasteners at crate skid.

2.Lift outside container and remove with all other inside protective spacers and bracing.

B.Remove boiler from skid. See Figure 2. Exercise care to avoid dropping boiler.

1.Place boiler in approximate location. Refer to Section I: Pre-Installation. Remove base hold down bolts.

2.Using pry bar under rear corner of Base End Panel, raise boiler and install 1½” wood blocks under rear corners. Install ¾” pipe roller between Base and skid.

3.Remove 1½” wood blocks. Place 3” pipe roller on floor behind skid.

4.Roll boiler off skid. Move skid out of way.

5.Roll boiler until 3” roller is located as shown. Use pry bar to install wood blocks under front corners of

base. Remove 3” roller.

Figure 2: Skid Removal

 

Figure 3: Tapping Locations

Table 3: Purpose of Tappings

Tapping

Size

Purpose

A

2”

Supply

B

2”

Return

C

3/4”

Relief Valve

D

3/4”

Limit

E

3/4”

Auxiliary Limit

F

3/4”

Washout

G

3/4”

Drain

Page 8
Image 8
Burnham 8H manual II. Boiler Assembly, Remove Crate