6. Connect Boiler Water Piping (continued)

7.Screw an installer-supplied 1¼” pipe or nipple into the water return tapping “R”.

8.Screw the supplied drain valve into tapping “D”.

9.See Figure 6b for suggested near boiler piping of IQ Options.

6-b

 

 

Item

Description

Burnham Part Number

1

1¼ x 1¼ x ½ Tee

806601021

2

Immersion Well, ½ NPT

80160456

3

1¼ x 6 Nipple

806600029

4

1¼ Tee

806601030

5

1¼ x ¾ Bushing

806600504

6

LWCO Sensor, ¾ NPT

102305-01

7

1¼ x 3 Nipple

806600005

8

1¼ Elbow

806601528

 

 

11

Page 11
Image 11
Burnham ES2 manual Connect Boiler Water Piping, Description Burnham Part Number