IV. Service

1.Inspection should be conducted annually. Service as frequently as specified in paragraphs below. While service or maintenance is being done, Electrical Power and all Gas Supply to the Boiler must be "off".

CAUTION

Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

ATTENTION. Au moment de l’entretien des commandes, étiquetez tous les fils avant de les débrancher. Les erreurs de câblage peuvent nuire au bon fonctionnement et être dangereuses.

S’assurer que l’appareil fonctionne adéquatement une fois l’entretien terminé.

2.Vent System. Vent system (see Figure 8 for typical installation) should be checked annually for:

A.Obstructions.

B.Accumulations of soot.

C.Deterioration of vent pipe or vent accessories due to condensation or other reasons.

D.Proper support - no sags, particularly in horizontal runs.

E.Tightness of joints.

F.Proper vent damper operation - see Section II Operating Instructions, paragraph 9.

G.Remove all accumulations of soot with wire brush and vacuum, see Figure 29. Remove all obstructions. Replace all deteriorated parts and support properly. Seal all joints.

3.Cleaning Boiler Flues, see Figure 29.

Flue passageways in the boiler sections should be checked annually for any blockage or accumulation of soot. To obtain access to flueways:

A.Remove vent pipe, damper (if boiler is so equipped), blocked vent switch, and draft hood.

B.Remove sheet metal screws securing Jacket Top Panel, lift panel and rotate about relief valve piping until top of boiler is exposed.

C.Remove bolts securing Canopy to Boiler Sections.

Remove Canopy - flueways are now exposed.

D.Models with flue gas baffles only: Remove baffles by lifting out of flueways.

Using flashlight, examine all flue passageways. If passageways are free of soot and obstruction, replace canopy (and flue gas baffles, if applicable), and seal.

Reinstall Jacket Top Panel, draft hood, blocked vent switch, damper (if boiler is so equipped), and vent pipe.

If the flue passageways need cleaning, remove burners as described in paragraph 4 below. Using long handle wire or bristle flue brush and vacuum, brush flueways thoroughly from top of boiler as illustrated in Figure 29. Replace canopy and seal with boiler putty. Reinstall Jacket Top Panel, draft hood, blocked vent switch, damper (if boiler is so equipped), and vent pipe.

NOTICE

4.Burners and firebox should be cleaned annually, and if necessary adjusted once a year BY a qualified service agency.

A. To remove burners for cleaning, changing orifice plugs, or repairs.

1.Remove the jacket front panel.

2.Disconnect pilot tubing at the gas valve. See Figure 17.

3.Disconnect thermocouple (standing pilot) or pilot lead wires (electronic ignition) at the gas valve.

4.40mm burners only. Remove injection shield assembly, where used. See Figure 30.

5.Remove wires to flame roll-out switch.

6.Remove the burner access panel.

7.Mark the location of the pilot main burner on the manifold if the marking on manifold is missing or obliterated.

Figure 29: Cleaning of Vent System

and Boiler Flues

26