Completing the Installation

c.Verify that the 100BASE-TX device at the other end of the twisted pair segment is powered up.

d.Check the cable for continuity.

e.If a link is not established, contact Cabletron Systems for technical support. Refer to Section 1.2 for details.

5.Repeat steps 1 through 4 above, until all connections have been made.

3.5COMPLETING THE INSTALLATION

After installing the 2H253-25R and any optional HSIM or VHSIM, and making the connections to the network, proceed as follows:

1.Secure the cables by running the cables along the strain-relief bracket and tying them to the strain-relief bracket using cable ties.

2.The 2H253-25R is now ready to be configured through Local Management. Refer to the SmartSwitch Series 2E253, 2H252, 2H253, and 2H258 Local Management User’s Guide for information on how to access and use Local Management.

3-10Installation

Page 40
Image 40
Cabletron Systems 2H253-25R manual Completing the Installation