Section 1. Preparation and Siting
1.2.1 Tools for Tower Installation
All Towers
Shovel
Rake
Open end wrenches: 3/8", 7/16", ½", (2) 9/16" Magnetic compass
6' Step ladder
TLX106 Tower
Tape measure (12’ to 20’)
Claw hammer
Level (24” to 36” )
Hand saw
Materials for concrete form:
(4)1" x 2" x 12" stakes
(2)2" x 4" x 96" lumber
(12)8p
(8)16p
20 ft form wire ½ Yard concrete Concrete trowel, edger
Electrical Fish tape or 20 feet of small diameter rope Wheelbarrow
1.2.2Tools for Instrumentation and Maintenance
All Towers
Lock and key for enclosure
Magnetic declination angle (Section 4)
Magnetic compass
Straight bit screwdrivers (small, medium, large)
Small diagonal
Wire strippers
Pocket knife
Calculator
Volt / Ohm Meter
Electrical Tape
Step ladder (6')
Datalogger prompt sheet
Station manuals
Station log and pen
Open end wrenches: 3/8", 7/16", ½", (2) 9/16"
Socket wrench and 7/16" deep well socket
Adjustable wrench
Pliers
Conduit and associated tools (as required)
Claw hammer
Pipe wrench (12")