AQUASNAP® 30RAP010-060 Liquid Chillers
with COMFORTLINKTM Controls
Installation Instructions
CONTENTS
Page
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . . . 1
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Step 1 — Rig and Place the Unit. . . . . . . . . . . . . . . . . . 1
•RIGGING
•PLACING UNIT
•MOUNTING UNIT
Step 2 — Check Compressor Mounting . . . . . . . . . . 6
Step 3 — Cooler Fluid and Drain Piping
Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
•ALL UNITS
•UNITS WITH
•AIR SEPARATION
Step 4 — Fill the Chilled Water Loop . . . . . . . . . . . . 15
•WATER SYSTEM CLEANING
•FILLING THE SYSTEM
•PREPARATION FOR
•FREEZE PROTECTION
•PREPARATION FOR WINTER SHUTDOWN
Step 5 — Make Electrical Connections . . . . . . . . . . 20
•POWER SUPPLY
•POWER WIRING
•FIELD CONNECTIONS
Step 6 — Install Accessories . . . . . . . . . . . . . . . . . . . . 29
• ELECTRICAL
Step 7 — Check Refrigerant Circuit . . . . . . . . . . . . . 29
•LEAK TESTING
•DEHYDRATION
•REFRIGERANT CHARGE
APPENDIX A (Pressure Drop Curves) . . . . . . . .
SAFETY CONSIDERATIONS
Installing, starting up, and servicing
Only trained, qualified installers and service mechanics should install, start up, and service this equipment (Fig. 1).
Untrained personnel can perform basic maintenance func- tions such as cleaning coils. All other operations should be performed by trained service personnel.
When working on the equipment, observe precautions in the literature and on tags, stickers, and labels attached to the equipment.
•Follow all safety codes.
•Wear safety glasses and work gloves.
•Keep quenching cloth and fire extinguisher nearby when brazing.
•Use care in handling, rigging, and setting bulky equipment.
These instructions cover installation of
.
WARNING
Electrical shock can cause personal injury and death. Shut off all power to this equipment during installation. There may be more than one disconnect switch. Tag all discon- nect locations to alert others not to restore power until work is completed.
INSTALLATION
Step 1 — Rig and Place the Unit
RIGGING — Preferred method for rigging is with spreader bars from above the unit. Use hooks in lifting holes. Rig at a single point with 4 cables or use spreader bars. All panels must be in place when rigging. See rigging label on unit for details concerning shipping weights, distance between lifting holes, center of gravity, and lifting ring dimensions. See Tables 1A and 1B for physical data. Refer to Fig. 3 for unit weights. See Fig. 4 for rigging label.
If overhead rigging is not possible, place chiller on skid or pad for rolling or dragging. When rolling, use a minimum of 3 rollers. When dragging, pull the pad. Do not apply force to the unit. When in final position, raise from above to lift unit off pad.
CAUTION
All panels must be in place when rigging. Damage to unit could result.
PLACING UNIT — There must be at least 3 ft (0.9 m) for service and for unrestricted airflow on all
Fig. 1 — Typical 30RAP Unit
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.