| LEGEND |
AFS | Ð Air¯ow Switch |
CB | Ð Circuit Breaker |
EQUIP | Ð Equipment |
FU | Ð Fuse |
GND | Ð Ground |
LLS1 | Ð Liquid Line Solenoid for |
| Solenoid Drop Control |
LLS2 | Ð Liquid Line Solenoid for |
| Capacity Control |
NEC | Ð National Electrical Code, U.S.A. |
TB | Ð Terminal Block |
TC | Ð Thermostat Cooling |
| Field Power Wiring |
| Field Control Wiring |
| Factory Installed Wiring |
10
NOTES:
1.Factory wiring in accordance with the NEC. Any field modi®cations or additions must be in compliance with all applicable codes.
2.All ®eld interlock contacts must have minimum rat- ing of 180 va pilot duty plus capacity required for
3.For internal unit wiring, reference wiring book or unit wiring label diagram. TB2 is
4.The following components are not located in the 38AKS unit control box: LLS1, LLS2, ®eld control thermostat, AFS, alarm