Carrier Access Adit 3500 quick start Compliant Installation

Models: Adit 3500

1 52
Download 52 pages 60.29 Kb
Page 7
Image 7

Quick Start Guide

Installation

Compliant Installation

NOTE: It is important the DS1/E1 Network Interface Cables are secured separately from the power and Signal Cables.

1.Inspect the unit.

2.Mount the unit.

zWall mounting installation, see Wall Mounting on page 9.

zWall mounting with Battery Backup Unit, see Battery Backup on page 12.

zRack mounting installation, see Rack Mounting on page 10.

3.Ground the unit.

WARNING! THE ADIT 3500 IS REQUIRED TO BE PERMANENTLY GROUNDED FOR THE PROTECTION OF USERS AND SERVICE PERSONNEL. REFER TO Grounding the Unit ON PAGE 3 FOR

DETAILED INSTRUCTIONS.

4.Connect DS1 (T1), and Ethernet connections as needed.

5.Connect RS-232 connector and connect via HyperTerm on your PC.

Note: With this running before power is enabled, you can monitor the boot process.

6.Attach PBX and phone line cables.

7.Connect Power to the unit.

8.Monitor the boot process on your PC, when complete the status light should be green.

9.For any software enabled features, enter the key command. See the key command in the Adit 3000 CLI Reference Manual, for detailed information.

10.To verify use the show version command.

11.To provision the unit. See Web-Based Management on page 23, for detailed instructions.

Adit 3500 - Release 1.6

7

Page 7
Image 7
Carrier Access Adit 3500 quick start Compliant Installation