Table of Contents

Mounting the Unit

Page

Dimensions

2

EL25 Installation

3

 

 

Rotating the Keypad for Vertical Mounting

3

Unlocking/Locking EL2000

4

 

 

EL2000 Installation

5

Wire Type

 

 

 

Wire Connections to Unit (Factory Settings for Relays)

6

Wire Specs and Run Distances

7

 

 

Power Wire Specs and Run Distances

7

Grounding the Unit

 

 

 

Grounding the Unit

8

Phone Lines

 

 

 

Wiring 1 Unit to Telco Line

9

Wiring Multiple Units to Telco Line

10

 

 

Wiring with No Telco Line

11

Wiring to Dedicated Telco Line

12

Wiring to an Internal Phone System

13

 

 

Connection to an NPBI System

14

External Devices

 

 

 

Wiring a Door Strike Lock

15

Wiring a Maglock

15

 

 

Wiring a Gate Operator

16

Wiring a Key Switch/PIR/REX

16

 

 

Wiring a Door Sensing Device

17

Wiring the AutoCall Feature

17

 

 

Wiring a Radio Frequency Module

18

Wiegand Card Reader / Keypad

18

Wiring a Postal Lock Switch

19

 

 

Wiring an Internal Camera (CCTV)

19

Power

 

 

 

Wiring Power to the Unit

20

Powering up and Checking the LEDs

20-21

Troubleshooting

22

Repair Parts

 

 

 

Repair Parts

23-24

“Your” Set-Up

 

 

 

“Your” System Diagram and Wiring Configuration

25-26

Accessories

27

FCC and DOC

 

 

 

FCC and DOC Requirements

28

Page 1