D. RUNNING INPUT WIRINGWARNING

Route but do not connect input wires at this time. If inputs are connected now, the gate operator may activate at random during installation, potentially injuring installation personnel.

1.Remove the plastic control box cover.

2.Run wires from input components conduits and Master/Slave conduits into control box.

3.For Master/Slave wiring, refer to Master/Slave Systems for X3 Series Gate Operators, Part 2.

E.SETTING GATE OPEN DIRECTION SWITCHES S2 AND S3Figure 5. Gate Direction and UPS Low Battery Switch Locations.

NOTE: For swing gate operation, controls are Left/Clockwise and

Right/Counterclockwise.

Switch S2 sets gate opening direction (open to left or open to right).

Switch S2 is sensed only on power up, it should be set when the power is off, or power should be cycled after setting the switch.

1.Set switch S2 to the Left for Clockwise Gate Opening, or to the Right for Counterclockwise Gate Opening as required.

2.Set switch S3 to the direction you wish the gate to move (left or right) and remain when the LOW BATTERY input is activated by an Uninterruptible Power Supply (UPS).

8 of 42

Doc 01-20099

Rev F