CONTENTS

 

Space requirement and installation diagram : CPVS Model 40-50-60-75

5

Section 1 - Description

6

A - General Information

6

B - Respect of the environment and prevention of pollution

6

C - Standard equipment

6

D - Definition of the pictograms

7

E - Electronic board

7

Section 2 - Installation

8

A - Handling

8

B - Room

8

C - Assembly

8

D - Air discharge piping

8

E - Condensate drain pipes

8

F - Electric cabling

9

Section 3 - Implementation

10

A - Preparation for start-up

10

B - First start-up

10

C -Discharge pressure adjustment

10

D - Parallel compressor assembly

10

E - Safety

10

Section 4 - Operation

11

A - Air and oil circuits

11

Section 5 - Options

12

A - Level detection bleed valve

12

B - Advanced filtration to the compression air inlet

12

C - Pre-filtration panels

13

D - Automatic restarting

14

E - Remote starting and stopping

14

F - Rotation direction indicator - Phase controller

14

G - Centrifugal separator

15

Section 6 - Specific information for CPVS 40-50-60-75

16

A - Description

16

B - Safety

16

C - Installation

16

D - Commissioning

17

E - Operating incidents

19

Section 7 - Maintenance

20

A - Oil level and change

21

B - Air filter

21

C - Turbine

21

D - Oil and air cooler

22

E - Oil separator

22

F - Oil return pipe

22

G - Draining condensation water

22

H - Temperature safety tests

22

I - Refastening electric connections

22

J - Decommissioning the compressor at the end of its useful life

22

Section 8 - Operating incidents

23

A - Main incidents

23

01/2008

Chicago Pneumatic Compressors

Page 4

62 305 258 65

Page 4
Image 4
Chicago Pneumatic CPVS 60, CPVS 40, CPVS 50, CPVS 75 instruction manual Contents