CONTENTS |
|
Space requirement and installation diagram : CPVS Model | 5 |
Section 1 - Description | 6 |
A - General Information | 6 |
B - Respect of the environment and prevention of pollution | 6 |
C - Standard equipment | 6 |
D - Definition of the pictograms | 7 |
E - Electronic board | 7 |
Section 2 - Installation | 8 |
A - Handling | 8 |
B - Room | 8 |
C - Assembly | 8 |
D - Air discharge piping | 8 |
E - Condensate drain pipes | 8 |
F - Electric cabling | 9 |
Section 3 - Implementation | 10 |
A - Preparation for | 10 |
B - First | 10 |
C | 10 |
D - Parallel compressor assembly | 10 |
E - Safety | 10 |
Section 4 - Operation | 11 |
A - Air and oil circuits | 11 |
Section 5 - Options | 12 |
A - Level detection bleed valve | 12 |
B - Advanced filtration to the compression air inlet | 12 |
C - | 13 |
D - Automatic restarting | 14 |
E - Remote starting and stopping | 14 |
F - Rotation direction indicator - Phase controller | 14 |
G - Centrifugal separator | 15 |
Section 6 - Specific information for CPVS | 16 |
A - Description | 16 |
B - Safety | 16 |
C - Installation | 16 |
D - Commissioning | 17 |
E - Operating incidents | 19 |
Section 7 - Maintenance | 20 |
A - Oil level and change | 21 |
B - Air filter | 21 |
C - Turbine | 21 |
D - Oil and air cooler | 22 |
E - Oil separator | 22 |
F - Oil return pipe | 22 |
G - Draining condensation water | 22 |
H - Temperature safety tests | 22 |
I - Refastening electric connections | 22 |
J - Decommissioning the compressor at the end of its useful life | 22 |
Section 8 - Operating incidents | 23 |
A - Main incidents | 23 |
01/2008 | Chicago Pneumatic Compressors |
Page 4 | 62 305 258 65 |