Send documentation comments to nexus5kdocs@cisco.com.
2-4
Cisco Nexus 6000 Series Hardware Installation Guide
OL-15902-01
Chapter2 Insta lling the Cisco Nexus 6000 Series Switches
Preparing for Installation
Required Equipment
Before beginning the installation, ensure that you have the following items available:
Four 12-24 or 10-32 screws for attaching slider rails to the rack
Number 1 and number 2 Phillips screwdrivers with torque capability
3/16-inch flat-blade screwdriver
Tape measure and level
ESD wrist strap or other grounding device
Antistatic mat or antistatic foam
The following additional items (not found in the accessory kit) are required to ground the chassis:
Grounding cable (6 AWG recommended), sized according to local and national installation
requirements; the required length depends on the proximity of the switch to proper grounding
facilities
Crimping tool large enough to accommodate the girth of the lug
Wire-stripping tool
Unpacking and Inspecting the Switch
Caution When handling switch components, wear an ESD strap and handle modules by their handles and carrier
edges only. An ESD socket is provided on the chassis. For the ESD socket to be effective, the chassis
must be grounded through the power cable, the chassis ground, or the metal-to-metal contact with a
grounded rack.
Tip Keep the shipping container in case the chassis requires shipping in the future.
Note The switch is thoroughly inspected before shipment. If any damage occurred during transportation or
any items are missing, contact your customer service representative immediately.
To inspect the shipment, follow these steps:
Step 1 Compare the shipment to the equipment list provided by your customer service representati ve and verify
that you have received all items, including the following:
Grounding lug kit
Rack-mount kit
ESD wrist strap
Cables with connectors
Any optional items ordered
Step 2 Check for damage and report any discrepancies or damage to your customer service representativ e. Hav e
the following information ready: