CONAIR

MARTIN

12. Transporting and storing

12.1Overview

Handling and transporting of the machinery should be carried out by specially trained personnel.

The machine is packed in weather-proof and partly shock-proof plastic sheeting. It is fixed with straps to a pallet for transportation.

12.1.1Unpacking and checking

Check that the machine has not been damaged in transit. Report any damage to the forwarder.

Do not unpack the machine until it has been moved to its installation location.

After unpacking, check that the delivery is complete by checking against the delivery note.

12.1.2Lift and transport to installation location

For information about the machine's weight, refer to chapter 2, Technical data.

For information about the space required, refer to chapter 10, Layout.

The machine can be lifted and handled using a fork-lift truck.

12.1.3Placing at the installation location

See chapter 5, Installation.

12.2Storing

Normally, the machine is pre-packed for transport to the installation location where it is to be put into operation immediately. Therefore, it is only protected with rust-preventive oil.

12.2.1Long-term storage

The machine should be kept in a storage area with constant temperature and humidity.

Before storing for a long time, the machine should be given a coating of long-term rust preventive, for example Castrol DWX 160 with durability 24Ê 36 months in a suitable storage area.

12.2.3Preservation

The machine is protected with rust-preventive oil Castrol DWX 22 on all surfaces which are not painted or rust-free.

12.2.4Durability

The rust protection from the rust-preventive oil Castrol DWX 22 is effective for up to 12 months if the conditions described in 12.2.1 are fulfilled.

0 5 - 1 5 - 9 6

7 9

28

Page 28
Image 28
Conair CMA-79 manual Transporting and storing, Storing