Drai n C on ne ct i on
To drain the chiller for storage or transport:
1Rotate the chiller’s drain valve counterclockwise. If using chemicals or additives with your process coolant, observe local disposal laws and regulations.
From Process inlet
Water level gauge
Fill/drain port
To Process outlet
2Close the chiller’s drain valve by turning it clockwise once final evacuation of all process coolant is complete.
IMPORTANT: Drainage procedures must be done prior to shipment or outdoor storage of the unit. If not, freezing damage can occur.
IMPORTANT: Ensure
3 n o i t a l l a t s n I
I n s t a l l a t i o n l 3 - 7