
PELLET (ALL FUEL) VENT SYSTEMS
Harvester installations requiring a connection from the product through a combustible wall require either a UL Listed thimble (wall penetration assembly) or other methods as outlined in the National Fire Protection Association (NFPA) Standard 211. Pellet (all fuel) vent system installations fall into 3 basic categories:
1)Direct Vent Installation
2)Flexible Liner Vent Installation
3)Vertical (inside or outside) Vent Installation
All pellet vent system installations must conform to the following basic requirements:
a.Insulation material used in wall
b.All clearances and thicknesses are minimums; larger clearances shall be permitted.
c.Any material used to close up an opening for the connector shall be of noncombustible material.
The installer should have significant experience and knowledge in pellet vent system variations. To maintain your Country Flame Warranty, it is imperative that a certified installer complete an installation that bests suits a
FIGURE 12: DIRECT VENT SYSTEM INSTALLATION
Version 2.0b | 28 |