NOTE:Referenceto rightandlefthandsideof thesnowthroweris fromthe operator'spositionatthe handle.

UNPACKING

1.Usingknife,cutalongthedottedlinesaroundthetop andbottomof cartonThenremovecartonmaterialasshownin. Figure2.

2.Removeshearpinsandcotterpinsfrompartsbagandplacein shear boltstoragebox.

3.Locateandremovethepartsbag.

NOTE:Setthefuelstabilizerasideuntiladdinggasolineto thefuel tank.Werecommendthatfuelstabilizerbeaddedto thefueleachtime thetankis filled.

4.Rollthesnowthroweroffthecartonby pullingonthelowerhandle. CAUTION:DONOTbackovercables.

5.Removethepackingmaterialfromthehandleassembly.

6.Cuttiessecuringtheclutchcontrolcablesto the lowerhandle. NOTE:Ifthecableshavebecomedisconnectedfromtheclutchlevers, reinstallthecablesasshowninFigure3.

Unpackingthe Snowthrower

Clutch Control Cables

ASSEMBLY

Figure 2

Figure3

11

Page 11
Image 11
Craftsman C950-52943-0 Removethepackingmaterialfromthehandleassembly, Unpackingthe Snowthrower Clutch Control Cables