Installation & Operation Manual

5 Hydronic piping (continued)

Figure 5-2Single Boiler - Recommended - Primary / Secondary Piping with a Hot Water Generator

HOT WATER

GENERATOR

WATER

GENERATOR

CIRCULATOR

FROM SYSTEM

SYSTEM RETURN

SENSOR

12"

MAX

RELIEF

BALL VALVE

(TYPICAL)

VALVE

 

AIR SEPERATOR

DRAIN PORT (TYPICAL)

SYSTEM SUPPLY

SENSOR

SYSTEM

CIRCULATOR

 

 

 

TO SYSTEM

BOILER

 

 

 

DRAIN

PRESSURE

 

MAKE UP

 

REDUCING VALVE

BACK FLOW

 

 

WATER

 

 

PREVENTER

EXPANSION

PRESSURE

 

 

 

TANK

GAUGE

 

 

Y-STRAINER

 

 

 

(RECOMMENDED)

 

 

 

FLOW CHECK

 

 

 

VALVE (TYPICAL)

 

 

 

BOILER PUMP

NOTICE

NOTICE

System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in operation to prevent short cycling and high limit issues.

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

27

Page 27
Image 27
Crestron electronic 3.5, 2.5, 1.5 service manual System