5 Hydronic piping

Table 5C Multiple Boilers - Common Header - Primary / Secondary Flow

Model

 

 

 

Number of Units

 

 

 

2

3

4

 

5

 

6

7

8

 

 

Recommended Common Header Pipe Sizes in Inches

 

FB 1500

4

4

5

 

5

 

6

6

7

FB 2000

4

5

5

 

6

 

7

7

8

FB 2500

5

5

6

 

7

 

7

8

10

FB 3000

5

6

7

 

7

 

8

10

10

FB 3500

5

6

7

 

8

 

10

10

10

[Based on a boiler ΔT of 30°F.]

NOTICE A system supply sensor (factory supplied) MUST BE installed for proper boiler operation.

Figure 5-3Multiple Boilers - Common Header - Recommended - Primary / Secondary Flow

HOT WATER

GENERATOR

WATER

GENERATOR

CIRCULATOR

FROM SYSTEM

 

 

SYSTEM RETURN

 

SENSOR

 

BALL VALVE

 

(TYPICAL)

RELIEF

AIR SEPARATOR

 

VALVE

DRAIN PORT

 

(TYPICAL)

 

SYSTEM SUPPLY

 

SENSOR

SYSTEM

CIRCULATOR

TO SYSTEM

MAKE UP

WATER

BACK FLOW

PREVENTER

PRESSURE

REDUCING VALVE

BOILER DRAIN

PRESSURE

(TYPICAL)

GAUGE

 

EXPANSION

TANK

Y-STRAINER (RECOMMENDED)

BOILER PUMP

 

 

 

FLOW CHECK

 

 

 

(TYPICAL)

 

 

 

VALVE (TYPICAL)

NOTICE

NOTICE

System flow should always remain higher than the required flow for the boiler(s) when the boiler(s) is in operation to prevent short cycling and high limit issues.

Please note that these illustrations are meant to show system piping concept only, the installer is responsible for all equipment and detailing required by local codes.

28

Page 28
Image 28
Crestron electronic 2.5, 3.5, 1.5 service manual Multiple Boilers Common Header Primary / Secondary Flow