BUILT-IN INSERT INSTALLATION . . . CONT

MINIMUM FRAMING DIMENSIONS:

The MINIMUM framed opening or clearances to all combustibles are as follows:

(Combustibles include drywall or any paper backed product, wood framing, insulation, vapor barrier, or any other product as set out in our local building code.)

 

Minimum

 

Traditional

 

Traditional

 

BayView

 

Bayview

 

Required

 

Unit Only

 

Minimum

 

Unit Only

 

Minimum

Side Clearance

3 in

 

22 1/4 in

 

28 1/4 in

 

24 in

 

30 in

 

 

 

 

 

 

 

 

 

 

Top Clearance

2 in

 

18 3/4 in

 

20 3/4 in

 

19—23 in

 

25—29 in

 

 

 

 

 

 

 

 

 

 

Back Clearance

6 in

 

11 3/4 in

 

17 3/4 in

 

10 3/4 in

 

16 3/4 in

Note: The BACK frame distance will be effected by the depth of the framed wall as well as the installation of

the exhaust venting.

Exterior Wall

Horizontal Vent Installation

 

 

Exterior Wall

TIP: To allow for much easier removal of the appliance and for clean- ing and maintenance , it is highly recommended

Wood Frame

Construction

8”

2” Min.

2’

10’

to make your framed opening as large as possible. It is suggested to use your overall Shroud Enclosure measurements and construct your framing to be 1 to 2 inches smaller than the shroud.

 

Air gap

Shroud

 

6”

6”

 

Wood Surround

12”

Stand Offs

Part ACI-3HZ

 

Wood Frame

8”

Construction

 

 

2” Min.

 

Air gap

Shroud

 

6”

6”

 

Wood Surround

Stand Offs

Part ACI-3HZ

3” minimum air gap

Wall Band / Support Brkt every 5’

Clean Out Tee

When constructing a chase ensure adequate insulation, vapor barrier, drywall and caulking is used. Keep in mind you are building another room to your home. You want it to be as energy efficient as the rest of your home.

Vertical Vent Installation

Vertical Vent Installation

 

2’

Interior

Chase

Rain Cap

 

 

 

Storm Collar

10’

 

 

 

 

 

 

Metal

 

 

 

 

 

 

 

 

Chase Cap

 

 

Ceiling Support /

 

 

 

 

Firestop Spacer

 

Ceiling Support /

 

 

 

 

 

 

Wood Frame

 

Firestop Spacer

 

 

 

Wood Frame

 

 

Construction

 

8”

 

 

8”

Construction

 

 

 

 

 

Wall Band /

 

Wall Band /

 

 

Support Brkt

 

 

 

 

Support Brkt

 

 

every 5’

 

 

 

 

every 5’

Shroud

 

 

 

 

 

Shroud

 

 

 

 

 

6”

 

3” minimum

 

3” minimum

 

air gap

6”

 

air gap

 

 

Clean Out Tee

 

Clean Out Tee

 

 

 

 

Wood Surround

Stand Off

 

Wood Surround

Stand Off

Part ACISOVL

 

 

 

 

 

Part ACISOVL

Glow Boy Pellet & Biomass

www.glowboystoves.com

23

 

 

23

 

 

 

Page 23
Image 23
Dansons Group FGB, IGB BUILT-IN Insert Installation . . . CON’T, Minimum Framing Dimensions, Top Clearance, Back Clearance