BUILT-IN INSTALLATION

CAUTION: DO NOT BLOCK ANY VENT OPENINGS

PELLET VENT MUST MAINTAIN A MINIMUM 3” CLEARANCE TO ANY COMBUSTIBLE.

(INSTALL VENT AT CLEARANCES SPECIFIED BY THE VENT MANUFACTURER).

DO NOT CONNECT THE PELLET VENT TO A VENT SERVING ANY OTHER APPLIANCE OR STOVE.

DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM OF THIS UNIT.

THE APPLIANCE MUST BY PLACED ON A NON-COMBUSTIBLE SURFACE,

BOTH ON THE HEARTH AND WITHIN THE FRAMED AREA.

(REFER TO FLOOR PROTECTION REQUIREMENTS IN THIS MANUAL.)

The Glow Boy Series Inserts may be framed directly into a wall as either a horizontal or vertical vent installation. (see figure 27, 28).

The exhaust installation requirements are the same as for a freestanding stove. Refer to

“Installing Freestanding Stove” for information concerning installation and proper hook-up of the exhaust.

NOTE: Built-in Installations require: Enclosure Spacer Kit — #ACI-3HZ Horizontal Kit or ACI-3VL Vertical Kit

Shroud 1”

Shroud 1”

12 1/4”

10 3/4”

 

18 3/4”

 

24”

24 3/4” 24”

 

 

 

6 1/2”

 

 

 

Exhaust

3 ½”

 

+

 

+

7 3/4”

 

 

 

 

Air Inlet

 

8 1/4”

 

 

 

12 1/4”

 

10 3/4”

 

 

26”

 

 

 

 

24”

 

 

 

 

 

 

 

 

 

Adjustable

 

 

 

 

 

 

Hopper

19”

 

 

6 ½”

 

 

 

 

 

 

 

 

-

 

 

Exhaust

 

 

 

23”

 

 

 

 

 

 

+

 

 

 

 

3 ½”

 

 

 

 

+

7 3/4”

 

 

 

 

 

 

24”

 

 

 

Air Inlet

8 1/4”

 

 

 

 

 

 

Classic Step Top Insert / Built-In

Glow Boy Pellet & Biomass

Bay View Insert / Built-In

www.glowboystoves.com 2222

Page 22
Image 22
Dansons Group IGB, FGB manual BUILT-IN Installation