Installer Final Checklist
GENERAL
❏Placement of Unit.
❏Specified clearance maintained to cabinet surfaces.
❏Unit Level- front to back, side to side.
❏All packaging material and tie straps removed.
ELECTRICAL:
❏Receptacle with 15 ampere current protection is provided for service cord connection.
❏Adequate ground connection.
GAS SUPPLY:
❏Connection: 1/2 NPT with a minimum 5/8” diameter flex line
❏The pressure regulator which is connected to the manifold is set for
❏Manual gas shut off valve installed in an accessible location.
❏Unit tested and free of gas leaks
OPERATION:
❏All internal packing materials are removed, i.e. below grates, around knobs, etc.
❏Bezels centered on burner knobs and knobs turn freely.
❏Each burner lights satisfactorily, both individually and with other burners operating.
❏Flame adjustment for 3/8" soft blue cone made on ports of each top burner.
❏Low flame operation verified.
❏All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.
❏Burner grates correctly positioned, level, and do not rock.