DCS CT-365GN, CT-365BL manual Installer Final Checklist, General, Electrical, GAS Supply, Operation

Models: CT-365GN CT-365BL

1 22
Download 22 pages 9.5 Kb
Page 17
Image 17

Installer Final Checklist

GENERAL

Placement of Unit.

Specified clearance maintained to cabinet surfaces.

Unit Level- front to back, side to side.

All packaging material and tie straps removed.

ELECTRICAL:

Receptacle with 15 ampere current protection is provided for service cord connection.

Adequate ground connection.

GAS SUPPLY:

Connection: 1/2 NPT with a minimum 5/8” diameter flex line

The pressure regulator which is connected to the manifold is set for 4.0”-for Natural Gas

Manual gas shut off valve installed in an accessible location.

Unit tested and free of gas leaks

OPERATION:

All internal packing materials are removed, i.e. below grates, around knobs, etc.

Bezels centered on burner knobs and knobs turn freely.

Each burner lights satisfactorily, both individually and with other burners operating.

Flame adjustment for 3/8" soft blue cone made on ports of each top burner.

Low flame operation verified.

All burner caps, burner rings and burner bases correctly seated in position, level, and do not rock or slide.

Burner grates correctly positioned, level, and do not rock.

16

Page 17
Image 17
DCS CT-365GN, CT-365BL manual Installer Final Checklist, General, Electrical, GAS Supply, Operation