EURO 25 | 22 |
OPERATION INSTRUCTIONS - Continued
START-UP PROCEDURE
1. Set the thermostat, if present, to the lowest level. Set the flame adjustment knob to the HI position. Press slightly and turn the control knob clockwise 3 to the OFF position and wait 5 minutes; thus allowing any gases to escape which may have accumulated in the combustion chamber.
Note: LP gases do not vent upward. Then follow step 2 and 3 to establish pilot.
2. Press slightly and turn control knob counterclockwise 4 to PILOT position; depress control knob and light pilot by repeatedly pressing the sparker. Venting of air may take place at the pilot prior to the flow of fuel gases. Once flame is established, hold knob depressed for approximately 60 sec.
3. Release knob. If pilot should go out, turn the control knob to OFF position and repeat steps 1, 2 and 3.
Note: this will allow reset of INTERLOCK for proper lighting of pilot.
4. Press and turn control knob counterclockwise 4 to ON position.
5.
6.
TEMPORARY SHUT-DOWN PROCEDURE
7. To turn off the main burner only, set the thermostat to the lowest setting or turn remote switch to OFF. Press and turn the knob clockwise 3 to PILOT position.
COMPLETE SHUT-DOWN PROCEDURE
8. Press and turn the knob clockwise 3 to the OFF position.
Flame and Heat Adjustment Knob
Control Knob