Dell 100, 110, 350 manual Two-Post Flush-MountRack Kit Installation, Rack Kit Contents

Models: 100 350 110

1 32
Download 32 pages 131 b
Page 11
Image 11
Two-Post Flush-Mount Rack Kit Installation

Two-Post Flush-Mount Rack Kit Installation

This procedure provides instructions for installing a Dell system in a two-post open- frame relay rack, such as those found in telecommunications equipment facilities. Both 3-inch and 6-inch wide 2-post racks are accommodated.

The two-post open-frame relay rack must be properly secured to the floor, to the ceiling or upper wall, and where applicable, to adjacent racks, using floor and wall fasteners and bracing specified or approved by the rack manufacturer or by industry standards. Refer to the two-post open-frame relay rack manufacturer’s installation documentation for precautionary warnings and information before attempting this installation.

CAUTION: Do not attempt to install the system into a two-post open-frame relay rack that has not been securely anchored in place. Damage to the system and personal injury may result.

See “Safety Instructions” found earlier in this guide for additional safety information regarding rack installation.

Rack Kit Contents

The two-post flush-mount rack kit includes the following items (see Figure 1-4):

Two flush-mount brackets

Two inner mounting rails

Four 12-24 x 0.5-inch pan-head Phillips (or slotted) screws

Four 10-24 x 0.25-inch flat-head slotted screws for securing the inner mounting rails to the sides of the system

One 1-U template

support.dell.com

Rack Installation Guide

1-5

Page 11
Image 11
Dell 100, 110, 350 manual Two-Post Flush-MountRack Kit Installation, Rack Kit Contents