Dell E09J, E10J owner manual About the SCv2000/SCv2020 Storage System

Models: E09J E10J

1 42
Download 42 pages 19.89 Kb
Page 13
Image 13

Item

Control/Feature

Icon

Description

 

 

 

 

3

MGMT port

10 Mbps, 100 Mbps, or 1 Gbps Ethernet port used for storage

 

 

 

system management and access to the BMC

 

 

 

NOTE: To use the MGMT port as an iSCSI port for

 

 

 

replication to another Storage Center, a Flex Port license

 

 

 

and replication license are required. To use the MGMT port

 

 

 

as a front-end connection to host servers, a Flex Port

 

 

 

license is required.

4

REPL port

10 Mbps, 100 Mbps, or 1 Gbps Ethernet/iSCSI port used for

 

 

 

replication to another Storage Center

 

 

 

NOTE: To use the RELP port as a front-end connection to

 

 

 

host servers, a Flex Port license is required.

5

SAS activity indicators

• Off: Port is off

 

 

 

• Steady green: Port is on, but without activity

 

 

 

• Blinking green: Port is on and there is activity

6

Storage controller

 

On: Storage controller completed POST

 

module status

 

 

7Recessed power off button

8Storage controller module fault

Powers down the storage controller if held for more than five seconds

Off: No faults

Steady amber: Firmware has detected an error

Blinking amber:Storage controller is performing POST

9Recessed reset button

10Identification LED

11USB port

12Diagnostic LEDs (8)

13Serial port (3.5 mm mini jack)

14Four or two iSCSI ports with two LEDs per port

15Mini-SAS port B

16Mini-SAS port A

Reboots the storage controller forcing it to restart at the POST process

• Off: Identification disabled

Blinking blue (for 15 sec.): Identification is enabled

Blinking blue (continuously): Storage controller shut down to the Advanced Configuration and Power Interface (ACPI) S5 state

Not for customer use on SCv2000/SCv2020 Storage Systems.

• Green LEDs 0–3: Low byte hex POST code

• Green LEDs 4–7: High byte hex POST code

Not for customer use.

• Off: No power

Steady Amber: Link

Blinking Green: Activity

Back-end expansion port B

Back-end expansion port A

About the SCv2000/SCv2020 Storage System

13

Page 13
Image 13
Dell E09J, E10J owner manual About the SCv2000/SCv2020 Storage System