Installing the Chassis | 15
4
Installing the Chassis
This chapter provides instructions to rack mount your E600i system into a standard 19-inch or 23-inch
equipment rack. It contains the following sections:
Unpacking the E600i System
Installing the Equipment Rack Shelf Bar
Standard Front Chassis Rack Mounting
Installing the Chassis into an Equipment Cabinet

Unpacking the E600i System

WARNING: The E600i packaging and contents weigh approximately 400 pounds. The unpacked chassis and
floater pallet weigh approximately 100 pounds. Do not attempt to lift or move the chassis without the use of a
hand cart, pallet jack, or forklift.
Remove all contents from the shipping packaging and move the chassis with a hand cart, pallet jack or
fork lift to its rack.
CAUTION: Lift the E600i chassis from the bottom only. Lifting by the chassis shelves or fan tray opening will
cause chassis damage. Do not remove the protective front shipping cover until you have completed the
chassis installation.
WARNING: Complete the chassis installation into the rack before you install any other component (fan tray,
AC power supplies or DC PEMs, line cards, RPMs, SFMs, cables).
WARNING: Electrostatic discharge (ESD) damage can occur when components are mishandled. Always
wear an ESD-preventative wrist or foot-heal ground strap when handling RPMs, SFMs, or line cards. After you
remove the original packaging, place RPMs, SFMs, and line cards on an antistatic surface.

Installing the Equipment Rack Shelf Bar

The rack shelf bar (
Figure 4-1
) enables you to easily position the chassis into the rack and provides the
unit additional stability in the rack.