Desa AND VM42 Installation, Continued, Ember And Pan Material Placement, Overtighten

Models: AND VM42

1 30
Download 30 pages 43.9 Kb
Page 13
Image 13
OVERTIGHTEN.

INSTALLATION

Gas Line Hook-Up (Cont.) Ember and Pan Material Placement

13

INSTALLATION

Continued

DESA recommends that a black iron gas line be routed from the gas source, through a sediment trap (shown in Figure 20), and into the appliance, Once connected through the appliance, a flexible gas line may be used for ease of installation to gas control valve (see Figure 21).

Before connecting the black iron gas line to the inside of the appliance a sediment trap must be included outside the appliance between the gas line and the gas shutoff valve. It must extend down three (3) inches beyond the center of the pipe. Prepare incoming black iron gas line with teflon tape or pipe joint compound (Check with local building codes).

EMBER AND PAN MATERIAL PLACEMENT CAUTION: Compounds used on threaded joints of gas piping shall be resistant to the action of Liquefied Petroleum (LP or propane), and should be applied lightly to ensure excess sealant does not enter the gas line.

Manual background WARNING: All gas piping and connections must be tested for leaks after the installation is completed.

After ensuring that the gas valve is on, apply a commer- cial leak detection solution to all connections and joints. If bubbles appear, leaks can be detected and corrected.

Do not use an open flame for leak testing and do not operate any appliance if a leak is detected.

Complete your gas installation by connecting incoming gas line with flexible gas line. Secure tightly with wrench but DO NOT

OVERTIGHTEN.

Incoming 1/2" Gas Line

Permitted by Local Codes

Sediment Trap

(Not Supplied)

 

Wall

Side

3" Min.

 

Appliance

(76mm)

Of

 

EMBER AND PAN MATERIAL PLACEMENT

1.Open the bag(s) of vermiculite and fill the entire burner pan until the burner tube is completely covered (see Figure 22).

2.Smooth the pan material just even with edges of the burner pan.

3.Remove the ember material from the bag and flatten small amounts into quarter size pieces and lay on top of the surface of the pan material (see Figure 23).

4.Place just enough to cover the entire surface and leave about a 1/2 inch gap under the lower grate members to allow air to flow (see Figure 24).

Grate

Vermiculite

Burner Pan

(Pan Material)

 

 

 

Figure 22 - Fill Entire Burner Pan with Vermiculite

 

Ember

Vermiculite

 

Grate

Material

Burner Pan

(Pan Material)

 

 

 

Figure 23 - Ember Material on Surface of Pan Material (Vermiculite)

Figure 20 - Sediment Trap

 

 

Red Surface Indicates For

 

 

Propane/LP Use Only

Pilot Adj

 

 

Flexible Gas Line

 

Gas Shutoff

 

 

Do NOT Kink

 

 

Valve

 

 

 

 

 

 

 

 

 

 

ON

 

 

 

 

T

 

 

 

 

O

 

 

 

 

L

 

 

 

 

I

 

 

 

 

P

 

 

 

 

OFF

 

 

Note:

IN OUT

 

1/2" NPT

1) Wire Connections

 

Outlet

 

Not Shown for Clarity

 

Incoming

 

 

Pressure

2) * 1/8" NPT Plugged

Inlet Pressure

Gas Line

Tap

 

Tapping

 

 

Tap

 

Pan and Ember

Grate Material

0.5"

0.5"

Burner Pan

Figure 24 - Pan and Ember Material Clearances

Figure 21 - Connecting Flexible Gas Line to Millivolt Valve

Manual backgroundManual backgroundManual backgroundManual backgroundFor more information, visit www.desatech.com

108795-01K

Page 13
Image 13
Desa AND VM42 installation manual Installation, Continued, Ember And Pan Material Placement, Overtighten