Desa AND VM42 installation manual Selecting Location, Pre-Installation Preparation, Clearances

Models: AND VM42

1 30
Download 30 pages 43.9 Kb
Page 6
Image 6
SELECTING LOCATION

6

SELECTING LOCATION PRE-INSTALLATION PREPARATION

Clearances

SELECTING LOCATION

To determine the safest and most efficient location for your appli- ance, you must take into consideration the following guidelines:

1.The location must allow for proper clearances (see Clearances, next column).

2.Consider a location where heat output would not be affected by drafts, air conditioning ducts, windows, or doors.

3.A location that avoids the cutting of joists or roof rafters will make installation easier. Figure 2 shows a plan view of a few common locations.

Flush installations are recommended where living space is limited or at a premium, and since the space required to enclose the appliance would be located beyond an outside wall, this would also reduce the cutting of joists, roof rafters, and such. Check local codes for any restrictions.

PRE-INSTALLATION

PREPARATION

CLEARANCES

Minimum clearances to combustibles are:

 

Back and Sides of Outer Surround

0" min.

Drywall to Sides of Front Face (Nailing Flanges) ... 0" min.

“B” Vent Surfaces

1" min.

Ceiling to Opening

42" min.

Floor

0" min.

Perpendicular Wall

See Figure 6, page 7

PRE-INSTALLATION CAUTION: Do not block required air spaces with insulation or any other material. Do not obstruct effective opening of appliance with any type of facing material.

Projected installations can extend any distance into the room. A projection may be ideal for a new addition on an existing, finished wall.

Corner installations make use of space that may not normally be used and provides a wider and more efficient range for radiant heat

Back

2 x 4 Stud

Nailing

Flange

transference.

Internal wall installations provide a discreet option for room separation and can also be ideal as an addition to an existing wall.

0" Clearance CLEARANCES

Left Side

Surround

0"

 

CORNER

 

 

INTERNAL WALL

INSTALLATION

Front Face

Drywall

INSTALLATION

 

 

 

 

 

 

Figure 3 - Minimum Clearances (Top View)

 

 

1" (25mm) Min.

 

 

Clearance to

 

 

"B" Vent’s Outer Pipe

FULL

FLUSH

Ceiling

 

INSTALLATION

 

 

PROJECTION

 

 

 

42" (1067mm)

 

INSTALLATION

 

 

 

Min. Clearance

Maintain 2" (51mm) Min.

 

 

from Opening to

Clearance to the Transition

 

 

Ceiling

Pipe as Measured at the

 

 

0" Clearance

Outer Vent Collar

Figure 2 - Possible Locations for Installing Appliance

*

*

*

DO NOT BLOCK

OR OBSTRUCT

OPENINGS

0" Clearance to Combustible or Noncombustible Flooring

*Required Air Spaces are Indicated with

an "*". Do Not Pack with Insulation or Any Other Material

Figure 4 - Minimum Clearances (Front View)

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundFor moreManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundvisit www.Manual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

108795-01K

Page 6
Image 6
Desa AND VM42 installation manual Selecting Location, Pre-Installation Preparation, Clearances