Desa VI33NRB, VI33PRB Continued, Installation Clearances, Installing Hood to Firebox

Models: VI33NRB VI33PRB

1 36
Download 36 pages 24.18 Kb
Page 11
Image 11
INSTALLING HOOD

INSTALLATION

Continued

INSTALLING HOOD

Install hood to top of firebox as shown in Fig- ure 10. Use 5 Phillips screws, provided, to at- tach hood to fireplace insert and 2 Phillips screws, provided, to attach hood and surround sides to fireplace insert.

Example

*

Screws

Figure 10 - Installing Hood to Firebox

INSTALLATION CLEARANCES

Figure 10 - Installing Hood to Firebox WARNING: Maintain the minimum clearances. If you can, provide greater clearances from floor, ceiling, and adjoining wall.

Carefully follow the instructions below. This will ensure safe installation.

Minimum Clearances For Side Combustible Material, Side Wall, and Ceiling

A.Clearances from the side of the fireplace cabi- net to any combustible material and wall should follow diagram in Figure 12, page 12. Example: The face of a mantel, bookshelf, etc. is made of combustible material and protrudes 3 1/2" from the wall. This combustible mate- rial must be 4" from the side of the fireplace opening (see Figure 11).

B.Clearances from the top of the fireplace open- ing to the ceiling should not be less than 42 inches.

*Minimum 16 inches from Side Wall

Figure 11 - Minimum Clearance for

Combustible to Wall

Mantel Clearances for Insert Installation If there is a mantel above masonry fireplace, you must meet minimum clearance between mantel shelf and top of fireplace opening (see Figure 12, page 12).

NOTICE: Surface temperatures of adjacent walls and mantels become hot during operation. Walls and mantels above the firebox may become hot to the touch. If installed properly, these temperatures meet the require- ments of the national product standard. Follow all minimum clearances shown in this manual.

NOTICE: If your installation does not meet the minimum clear- ances shown, you must do one of the following:

raise the mantel to an accept- able height

remove the mantel

113195-01A

www.desatech.com

11

Page 11
Image 11
Desa VI33NRB, VI33PRB Continued, Installation Clearances, Installing Hood to Firebox, Minimum Clearance for